California Davis-Bacon prevailing wages
Federal Davis-Bacon rates apply to construction projects in California that receive federal funding or federal assistance. These rates are specific to each county and construction type—building, residential, heavy, or highway—so you’ll need to match your project’s location and scope to the correct wage determination. California also has its own prevailing-wage system, managed by the Department of Industrial Relations (DIR), but PrevailMap focuses solely on federal Davis-Bacon rates, not DIR rates. When a project falls under both federal and state prevailing-wage laws, contractors must pay the higher rate for each classification. Weekly certified payroll (form WH-347) is required on federal jobs, including a signed statement of compliance. Always verify the rates against the wage determination attached to your contract.
Federal Davis-Bacon coverage in California kicks in when a construction contract exceeds $2,000 on a federal project — a military base, a VA hospital — or a federally-assisted one, such as HUD-funded housing or FAA airport work. When a job carries both federal and state funding, common in infrastructure and affordable housing, you cross-check the federal wage determination against California’s DIR rates for the same county and work type and pay the higher rate for each classification: if the DIR rate is higher it controls, and if the federal rate is higher it does.
To find the right determination, match the project’s county and construction type — say, Alameda County heavy construction — then apply those rates to the weekly certified payroll (WH-347) with its signed statement of compliance. Missing the higher-of-two rule or skipping certified payroll can mean back wages, penalties, or trouble bidding future federal work, and because the federal and state labor agencies enforce separately, it’s worth confirming DIR’s rates yourself on any mixed-funded job.
New to Davis-Bacon? How federal prevailing wage works →
- Determinations
- 28
- Counties covered
- 58
- Construction types
- 3
- Rates last verified
- August 13, 2026
Cached daily from SAM.gov: Building 15 · Residential 11 · Heavy 2
28 current determinations, grouped by construction type. Each link is one wage determination and the counties it covers.
Building construction
- Alameda, Calaveras, Contra Costa & 14 more countiesCA20260018 · 486 classifications
- Alpine, Amador, Butte & 21 more countiesCA20260007 · 321 classifications
- Amador CountyCA20260023 · 130 classifications
- Del Norte, Humboldt, Lake & Mendocino CountiesCA20260005 · 131 classifications
- Imperial CountyCA20260002 · 138 classifications
- Inyo, Kern & Mono CountiesCA20260020 · 149 classifications
- Los Angeles CountyCA20260022 · 134 classifications
- Orange CountyCA20260024 · 131 classifications
- Riverside CountyCA20260025 · 126 classifications
- San Bernardino CountyCA20260026 · 132 classifications
- San Diego CountyCA20260001 · 145 classifications
- San Luis Obispo CountyCA20260012 · 129 classifications
- Santa Barbara CountyCA20260014 · 130 classifications
- Tulare CountyCA20260016 · 24 classifications
- Ventura CountyCA20260015 · 128 classifications
Residential construction
- Alameda, Contra Costa, El Dorado & 15 more countiesCA20260019 · 343 classifications
- Alpine, Amador, Calaveras & 3 more countiesCA20260029 · 10 classifications
- Butte CountyCA20260008 · 14 classifications
- Colusa, Glenn, Lassen & 7 more countiesCA20260030 · 10 classifications
- Del Norte, Lake & Mendocino CountiesCA20260031 · 10 classifications
- Fresno, Kern, Madera & 4 more countiesCA20260009 · 78 classifications
- Humboldt CountyCA20260027 · 9 classifications
- Imperial, Los Angeles, Orange & 5 more countiesCA20260017 · 179 classifications
- Kings CountyCA20260011 · 12 classifications
- Shasta CountyCA20260013 · 7 classifications
- Tuolumne CountyCA20260028 · 9 classifications
Heavy construction
Davis-Bacon prevailing wage: common questions
- Do I need certified payroll for a federal job?
- Yes. For Davis-Bacon covered contracts, you must submit weekly certified payroll (Form WH-347) with a signed Statement of Compliance. This applies to both prime contractors and subcontractors.
- What is the difference between base rate and fringe?
- The base rate is the hourly cash wage. The fringe is benefits (e.g., health insurance, retirement). The total prevailing wage is base + fringe. You can pay it as all cash, all benefits, or a mix.
- What does a * in the fringe column mean?
- A '*' means the fringe rate is defined in a collective bargaining agreement (CBA) or other source—not zero. You must obtain the actual rate from the CBA; the WD alone doesn’t show it.
- How often do wage determinations change?
- Wage determinations (WDs) are updated periodically, sometimes annually. Always use the WD revision number specified in your contract—even if newer versions exist.
- Which wage determination applies to my job?
- Use the WD incorporated into your contract. It’s based on the project’s location (usually county) and construction type (e.g., building, highway). Check the contract or ask the awarding agency.
- Do these federal rates replace my state's prevailing wage?
- No. Federal Davis-Bacon rates apply only to federally funded projects. State prevailing wage laws may still apply to other work. Always check both requirements.