CA20260019
Alameda, Contra Costa, El Dorado, Marin, Monterey, Napa, Placer, Sacramento, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz, Solano, Sonoma, Sutter, Yolo & Yuba Counties, California
Revision 5 · Published May 18, 2026 · 343 classifications · Residential construction · Latest cached revision
This determination sets federal Davis-Bacon rates for Alameda, Contra Costa, El Dorado, Marin, Monterey, Napa, Placer, Sacramento, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz, Solano, Sonoma, Sutter, Yolo & Yuba Counties, California on residential construction. It lists 343 classifications, with base rates from $23.10 (ELECTRICIAN: WORK ON SINGLE FAMILY HOMES AND APARTMENTS UP TO AND INCLUDING 3) to $91.25 (ELECTRICIAN: ALL OTHER WORK (SAN FRANCISCO COUNTY:)). Every classification lists a numeric fringe.
Showing 343 of 343 classifications
| Classification | Base | Fringe | Total |
|---|---|---|---|
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATINGASBE0016-002Base $64.56 + fringe $25.07 = you must pay at least $89.63/hr in wages + benefits. | $64.56 | $25.07 | $89.63 |
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATINGASBE0016-002Base $84.76 + fringe $25.07 = you must pay at least $109.83/hr in wages + benefits. | $84.76 | $25.07 | $109.83 |
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMINGASBE0016-009Base $34.56 + fringe $11.40 = you must pay at least $45.96/hr in wages + benefits. | $34.56 | $11.40 | $45.96 |
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMINGASBE0016-009Base $36.53 + fringe $9.27 = you must pay at least $45.80/hr in wages + benefits. | $36.53 | $9.27 | $45.80 |
MARBLE FINISHERBRCA0003-001Base $42.06 + fringe $19.80 = you must pay at least $61.86/hr in wages + benefits. | $42.06 | $19.80 | $61.86 |
BRICKLAYER: (16) MONTEREY, SANTA CRUZ SPECIALTY PAY: (A) UNDERGROUND WORK SUCHBRCA0003-002Base $54.18 + fringe $27.82 = you must pay at least $82.00/hr in wages + benefits. | $54.18 | $27.82 | $82.00 |
BRICKLAYER: ( 9) EL DORADO, PLACER, SACRAMENTO, SUTTER SPECIALTY PAY: (A)BRCA0003-002Base $52.76 + fringe $25.01 = you must pay at least $77.77/hr in wages + benefits. | $52.76 | $25.01 | $77.77 |
BRICKLAYER: ( 8) ALAMEDA, CONTRA COSTA, SAN BENITO, SANTA CLARA SPECIALTY PAYBRCA0003-002Base $56.94 + fringe $26.28 = you must pay at least $83.22/hr in wages + benefits. | $56.94 | $26.28 | $83.22 |
BRICKLAYER: ( 7) MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SOLANO, SONOMABRCA0003-002Base $57.02 + fringe $28.50 = you must pay at least $85.52/hr in wages + benefits. | $57.02 | $28.50 | $85.52 |
$1.00 PER HOUR ADDITIONALBRCA0003-007Base $60.58 + fringe $29.79 = you must pay at least $90.37/hr in wages + benefits. | $60.58 | $29.79 | $90.37 |
TERRAZZO FINISHERBRCA0003-007Base $44.93 + fringe $20.98 = you must pay at least $65.91/hr in wages + benefits. | $44.93 | $20.98 | $65.91 |
MARBLE MASONBRCA0003-009Base $61.72 + fringe $30.31 = you must pay at least $92.03/hr in wages + benefits. | $61.72 | $30.31 | $92.03 |
TILE LAYER (SONOMA)BRCA0003-012Base $56.79 + fringe $22.54 = you must pay at least $79.33/hr in wages + benefits. | $56.79 | $22.54 | $79.33 |
TILE LAYERBRCA0003-012Base $55.55 + fringe $21.08 = you must pay at least $76.63/hr in wages + benefits. | $55.55 | $21.08 | $76.63 |
TILE LAYERBRCA0003-012Base $59.92 + fringe $22.62 = you must pay at least $82.54/hr in wages + benefits. | $59.92 | $22.62 | $82.54 |
TILE FINISHER (SONOMA)BRCA0003-012Base $35.78 + fringe $19.23 = you must pay at least $55.01/hr in wages + benefits. | $35.78 | $19.23 | $55.01 |
TILE FINISHERBRCA0003-012Base $35.00 + fringe $17.44 = you must pay at least $52.44/hr in wages + benefits. | $35.00 | $17.44 | $52.44 |
TILE FINISHERBRCA0003-012Base $37.75 + fringe $19.28 = you must pay at least $57.03/hr in wages + benefits. | $37.75 | $19.28 | $57.03 |
CARPENTERS: MILLWRIGHT (SAN FRANCISCO COUNTY)CARP0022-001Base $60.49 + fringe $35.11 = you must pay at least $95.60/hr in wages + benefits. | $60.49 | $35.11 | $95.60 |
CARPENTERS: JOURNEYMAN CARPENTER (SAN FRANCISCO COUNTY)CARP0022-001Base $60.39 + fringe $33.52 = you must pay at least $93.91/hr in wages + benefits. | $60.39 | $33.52 | $93.91 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0022-001Base $60.54 + fringe $33.52 = you must pay at least $94.06/hr in wages + benefits. | $60.54 | $33.52 | $94.06 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN FRANCISCO COUNTY)CARP0022-001Base $60.39 + fringe $33.52 = you must pay at least $93.91/hr in wages + benefits. | $60.39 | $33.52 | $93.91 |
DRYWALL STOCKER/SCRAPPER: (AREA 4) AREA 4: El Dorado, Placer, SacramentoCARP0035-005Base $24.07 + fringe $18.58 = you must pay at least $42.65/hr in wages + benefits. | $24.07 | $18.58 | $42.65 |
Monterey, San Benito & Santa Cruz CountiesCARP0035-005Base $24.49 + fringe $18.58 = you must pay at least $43.07/hr in wages + benefits. | $24.49 | $18.58 | $43.07 |
Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa ClaraCARP0035-005Base $27.43 + fringe $18.58 = you must pay at least $46.01/hr in wages + benefits. | $27.43 | $18.58 | $46.01 |
DRYWALL INSTALLERS/LATHERS: (AREA 4) AREA 4: El Dorado, Placer, SacramentoCARP0035-005Base $48.12 + fringe $31.93 = you must pay at least $80.05/hr in wages + benefits. | $48.12 | $31.93 | $80.05 |
Monterey, San Benito & Santa Cruz CountiesCARP0035-005Base $48.97 + fringe $31.93 = you must pay at least $80.90/hr in wages + benefits. | $48.97 | $31.93 | $80.90 |
Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa ClaraCARP0035-005Base $54.85 + fringe $31.93 = you must pay at least $86.78/hr in wages + benefits. | $54.85 | $31.93 | $86.78 |
CARPENTER: MILLWRIGHT MARIN COUNTYCARP0035-009Base $52.75 + fringe $32.41 = you must pay at least $85.16/hr in wages + benefits. | $52.75 | $32.41 | $85.16 |
CARPENTER: JOURNEYMAN CARPENTER MARIN COUNTYCARP0035-009Base $52.65 + fringe $30.82 = you must pay at least $83.47/hr in wages + benefits. | $52.65 | $30.82 | $83.47 |
CARPENTER: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0035-009Base $52.80 + fringe $30.82 = you must pay at least $83.62/hr in wages + benefits. | $52.80 | $30.82 | $83.62 |
CARPENTER: BRIDGE BUILDER/HIGHWAY CARPENTER MARIN COUNTYCARP0035-009Base $52.65 + fringe $30.82 = you must pay at least $83.47/hr in wages + benefits. | $52.65 | $30.82 | $83.47 |
CARPENTERS: MILLWRIGHT EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLOCARP0046-001Base $57.01 + fringe $35.11 = you must pay at least $92.12/hr in wages + benefits. | $57.01 | $35.11 | $92.12 |
CARPENTERS: JOURNEYMAN CARPENTER EL DORADO (WEST), PLACER (WEST), SACRAMENTOCARP0046-001Base $54.51 + fringe $33.52 = you must pay at least $88.03/hr in wages + benefits. | $54.51 | $33.52 | $88.03 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0046-001Base $54.66 + fringe $33.52 = you must pay at least $88.18/hr in wages + benefits. | $54.66 | $33.52 | $88.18 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER EL DORADO (WEST), PLACER (WEST)CARP0046-001Base $60.39 + fringe $33.52 = you must pay at least $93.91/hr in wages + benefits. | $60.39 | $33.52 | $93.91 |
CARPENTERS: MILLWRIGHT (EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBACARP0046-003Base $55.66 + fringe $35.11 = you must pay at least $90.77/hr in wages + benefits. | $55.66 | $35.11 | $90.77 |
CARPENTERS: JOURNEYMAN CARPENTER (EL DORADO (EAST), PLACER (EAST), SUTTER ANDCARP0046-003Base $53.16 + fringe $33.52 = you must pay at least $86.68/hr in wages + benefits. | $53.16 | $33.52 | $86.68 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0046-003Base $53.31 + fringe $33.52 = you must pay at least $86.83/hr in wages + benefits. | $53.31 | $33.52 | $86.83 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (EL DORADO (EAST), PLACER (EAST)CARP0046-003Base $60.39 + fringe $33.52 = you must pay at least $93.91/hr in wages + benefits. | $60.39 | $33.52 | $93.91 |
CARPENTERS: MILLWRIGHT (CONTRA COSTA COUNTY)CARP0152-001Base $52.75 + fringe $32.41 = you must pay at least $85.16/hr in wages + benefits. | $52.75 | $32.41 | $85.16 |
CARPENTERS: JOURNEYMAN CARPENTER (CONTRA COSTA COUNTY)CARP0152-001Base $52.65 + fringe $30.82 = you must pay at least $83.47/hr in wages + benefits. | $52.65 | $30.82 | $83.47 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0152-001Base $52.80 + fringe $30.82 = you must pay at least $83.62/hr in wages + benefits. | $52.80 | $30.82 | $83.62 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (CONTRA COSTA COUNTY)CARP0152-001Base $52.65 + fringe $30.82 = you must pay at least $83.47/hr in wages + benefits. | $52.65 | $30.82 | $83.47 |
CARPENTERS: MILLWRIGHT SOLANO COUNTYCARP0180-001Base $54.95 + fringe $33.08 = you must pay at least $88.03/hr in wages + benefits. | $54.95 | $33.08 | $88.03 |
CARPENTERS: JOURNEYMAN CARPENTER SOLANO COUNTYCARP0180-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0180-001Base $55.00 + fringe $31.49 = you must pay at least $86.49/hr in wages + benefits. | $55.00 | $31.49 | $86.49 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER SOLANO COUNTYCARP0180-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: MILLWRIGHT (SAN MATEO COUNTY)CARP0217-001Base $60.49 + fringe $35.11 = you must pay at least $95.60/hr in wages + benefits. | $60.49 | $35.11 | $95.60 |
CARPENTERS: JOURNEYMAN CARPENTER (SAN MATEO COUNTY)CARP0217-001Base $60.39 + fringe $33.52 = you must pay at least $93.91/hr in wages + benefits. | $60.39 | $33.52 | $93.91 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0217-001Base $60.54 + fringe $33.52 = you must pay at least $94.06/hr in wages + benefits. | $60.54 | $33.52 | $94.06 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN MATEO COUNTY)CARP0217-001Base $60.39 + fringe $33.52 = you must pay at least $93.91/hr in wages + benefits. | $60.39 | $33.52 | $93.91 |
CARPENTERS: MILLWRIGHT (SANTA CLARA COUNTY)CARP0405-001Base $54.95 + fringe $33.08 = you must pay at least $88.03/hr in wages + benefits. | $54.95 | $33.08 | $88.03 |
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CLARA COUNTY)CARP0405-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0405-001Base $55.00 + fringe $31.49 = you must pay at least $86.49/hr in wages + benefits. | $55.00 | $31.49 | $86.49 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA CLARA COUNTY)CARP0405-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: MILLWRIGHT (SAN BENITO COUNTY)CARP0405-002Base $51.47 + fringe $33.08 = you must pay at least $84.55/hr in wages + benefits. | $51.47 | $33.08 | $84.55 |
CARPENTERS: JOURNEYMAN CARPENTER (SAN BENITO COUNTY)CARP0405-002Base $48.97 + fringe $31.49 = you must pay at least $80.46/hr in wages + benefits. | $48.97 | $31.49 | $80.46 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0405-002Base $49.12 + fringe $31.49 = you must pay at least $80.61/hr in wages + benefits. | $49.12 | $31.49 | $80.61 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN BENITO COUNTY)CARP0405-002Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: MILLWRIGHT (SANTA CRUZ COUNTY)CARP0505-001Base $51.47 + fringe $33.08 = you must pay at least $84.55/hr in wages + benefits. | $51.47 | $33.08 | $84.55 |
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CRUZ COUNTY)CARP0505-001Base $48.97 + fringe $31.49 = you must pay at least $80.46/hr in wages + benefits. | $48.97 | $31.49 | $80.46 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0505-001Base $49.12 + fringe $31.49 = you must pay at least $80.61/hr in wages + benefits. | $49.12 | $31.49 | $80.61 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA CRUZ COUNTY)CARP0505-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: MILLWRIGHT (MONTEREY COUNTY)CARP0605-001Base $51.47 + fringe $33.08 = you must pay at least $84.55/hr in wages + benefits. | $51.47 | $33.08 | $84.55 |
CARPENTERS: JOURNEYMAN CARPENTER (MONTEREY COUNTY)CARP0605-001Base $48.97 + fringe $31.49 = you must pay at least $80.46/hr in wages + benefits. | $48.97 | $31.49 | $80.46 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0605-001Base $49.12 + fringe $31.49 = you must pay at least $80.61/hr in wages + benefits. | $49.12 | $31.49 | $80.61 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (MONTEREY COUNTY)CARP0605-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: MILLWRIGHT (ALAMEDA COUNTY)CARP0713-001Base $54.95 + fringe $33.08 = you must pay at least $88.03/hr in wages + benefits. | $54.95 | $33.08 | $88.03 |
CARPENTERS: JOURNEYMAN CARPENTER (ALAMEDA COUNTY)CARP0713-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0713-001Base $55.00 + fringe $31.49 = you must pay at least $86.49/hr in wages + benefits. | $55.00 | $31.49 | $86.49 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (ALAMEDA COUNTY)CARP0713-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: MILLWRIGHT (NAPA AND SONOMA COUNTIES)CARP0751-001Base $54.95 + fringe $33.08 = you must pay at least $88.03/hr in wages + benefits. | $54.95 | $33.08 | $88.03 |
CARPENTERS: JOURNEYMAN CARPENTER (NAPA AND SONOMA COUNTIES)CARP0751-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0751-001Base $55.00 + fringe $31.49 = you must pay at least $86.49/hr in wages + benefits. | $55.00 | $31.49 | $86.49 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (NAPA AND SONOMA COUNTIES)CARP0751-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
SOUND & COMMUNICATIONS: TECHNICIAN (SAN FRANCISCO COUNTY) SCOPE OF WORKELEC0006-003Base $67.65 + fringe $31.78 = you must pay at least $99.43/hr in wages + benefits. | $67.65 | $31.78 | $99.43 |
SOUND & COMMUNICATIONS: INSTALLER (SAN FRANCISCO COUNTY) SCOPE OF WORKELEC0006-003Base $58.83 + fringe $31.51 = you must pay at least $90.34/hr in wages + benefits. | $58.83 | $31.51 | $90.34 |
ELECTRICIAN (SAN FRANCISCO COUNTY) WORK ON RESIDENTIAL WOOD FRAME REMODEL ANDELEC0006-005Base $55.50 + fringe $25.64 = you must pay at least $81.14/hr in wages + benefits. | $55.50 | $25.64 | $81.14 |
ELECTRICIAN: ALL OTHER WORK (SAN FRANCISCO COUNTY:)ELEC0006-009Base $91.25 + fringe $48.05 = you must pay at least $139.30/hr in wages + benefits. | $91.25 | $48.05 | $139.30 |
ELECTRICIAN (NAPA & SOLANO COUNTIES)ELEC0180-002Base $38.50 + fringe $21.16 = you must pay at least $59.66/hr in wages + benefits. | $38.50 | $21.16 | $59.66 |
ELECTRICIAN: ZONE BELEC0234-002Base $77.45 + fringe $33.97 = you must pay at least $111.42/hr in wages + benefits. | $77.45 | $33.97 | $111.42 |
ELECTRICIAN: ZONE AELEC0234-002Base $70.41 + fringe $33.76 = you must pay at least $104.17/hr in wages + benefits. | $70.41 | $33.76 | $104.17 |
SOUND & COMMUNICATIONS: TECHNICIANELEC0234-004Base $55.12 + fringe $24.30 = you must pay at least $79.42/hr in wages + benefits. | $55.12 | $24.30 | $79.42 |
SOUND & COMMUNICATIONS: INSTALLERELEC0234-004Base $47.93 + fringe $24.09 = you must pay at least $72.02/hr in wages + benefits. | $47.93 | $24.09 | $72.02 |
ELECTRICIAN (CONTRA COSTA COUNTY)ELEC0302-002Base $66.26 + fringe $35.84 = you must pay at least $102.10/hr in wages + benefits. | $66.26 | $35.84 | $102.10 |
CABLE SPLICER (CONTRA COSTA COUNTY)ELEC0302-002Base $74.54 + fringe $36.09 = you must pay at least $110.63/hr in wages + benefits. | $74.54 | $36.09 | $110.63 |
SOUND & COMMUNICATIONS: TECHNICIAN (CONTRA COSTA COUNTY) SCOPE OF WORKELEC0302-004Base $61.04 + fringe $31.08 = you must pay at least $92.12/hr in wages + benefits. | $61.04 | $31.08 | $92.12 |
SOUND & COMMUNICATIONS: INSTALLER (CONTRA COSTA COUNTY) SCOPE OF WORKELEC0302-004Base $53.08 + fringe $30.84 = you must pay at least $83.92/hr in wages + benefits. | $53.08 | $30.84 | $83.92 |
ELECTRICIAN (SANTA CLARA COUNTY)ELEC0332-002Base $47.35 + fringe $23.49 = you must pay at least $70.84/hr in wages + benefits. | $47.35 | $23.49 | $70.84 |
SOUND & COMMUNICATIONS: TECHNICIAN (SANTA CLARA COUNTY) SCOPE OF WORKELEC0332-004Base $67.08 + fringe $31.26 = you must pay at least $98.34/hr in wages + benefits. | $67.08 | $31.26 | $98.34 |
SOUND & COMMUNICATIONS: INSTALLER (SANTA CLARA COUNTY) SCOPE OF WORK: INCLUDINGELEC0332-004Base $58.33 + fringe $31.00 = you must pay at least $89.33/hr in wages + benefits. | $58.33 | $31.00 | $89.33 |
ELECTRICIAN: WORK ON SINGLE FAMILY HOMES AND APARTMENTS UP TO AND INCLUDING 3ELEC0340-001Base $23.10 + fringe $12.48 = you must pay at least $35.58/hr in wages + benefits. | $23.10 | $12.48 | $35.58 |
ELECTRICIAN: FOUR STORIESELEC0340-001Base $39.06 + fringe $24.51 = you must pay at least $63.57/hr in wages + benefits. | $39.06 | $24.51 | $63.57 |
SOUND & COMMUNICATIONS: TECHNICIANELEC0340-004Base $46.00 + fringe $25.68 = you must pay at least $71.68/hr in wages + benefits. | $46.00 | $25.68 | $71.68 |
SOUND & COMMUNICATIONS: INSTALLERELEC0340-004Base $40.00 + fringe $25.50 = you must pay at least $65.50/hr in wages + benefits. | $40.00 | $25.50 | $65.50 |
ELECTRICIAN (EL DORADO AND PLACER COUNTIES) ZONE PAY: ZONE 1 - 0 TO 70 MILESELEC0401-006Base $31.88 + fringe $8.46 = you must pay at least $40.34/hr in wages + benefits. | $31.88 | $8.46 | $40.34 |
ELECTRICIAN (MARIN AND SONOMA COUNTIES)ELEC0551-003Base $41.00 + fringe $24.26 = you must pay at least $65.26/hr in wages + benefits. | $41.00 | $24.26 | $65.26 |
ELECTRICIAN (ALAMEDA COUNTY)ELEC0595-004Base $76.00 + fringe $49.07 = you must pay at least $125.07/hr in wages + benefits. | $76.00 | $49.07 | $125.07 |
CABLE SPLICER (ALAMEDA COUNTY)ELEC0595-004Base $87.40 + fringe $49.41 = you must pay at least $136.81/hr in wages + benefits. | $87.40 | $49.41 | $136.81 |
SOUND & COMMUNICATIONS, INSTALLER (ALAMEDA COUNTY) SCOPE OF WORK: INCLUDING ANYELEC0595-007Base $56.68 + fringe $28.35 = you must pay at least $85.03/hr in wages + benefits. | $56.68 | $28.35 | $85.03 |
ELECTRICIAN (SAN MATEO COUNTY)ELEC0617-002Base $86.00 + fringe $51.07 = you must pay at least $137.07/hr in wages + benefits. | $86.00 | $51.07 | $137.07 |
EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FORELEV0008-001Base $84.05 + fringe $38.44 = you must pay at least $122.49/hr in wages + benefits. | $84.05 | $38.44 | $122.49 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: CRANESENGI0003-009Base $63.06 + fringe $34.69 = you must pay at least $97.75/hr in wages + benefits. | $63.06 | $34.69 | $97.75 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: HYDRAULICENGI0003-009Base $44.44 + fringe $31.15 = you must pay at least $75.59/hr in wages + benefits. | $44.44 | $31.15 | $75.59 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: OILERENGI0003-009Base $42.55 + fringe $31.15 = you must pay at least $73.70/hr in wages + benefits. | $42.55 | $31.15 | $73.70 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: TRUCKENGI0003-009Base $44.83 + fringe $31.15 = you must pay at least $75.98/hr in wages + benefits. | $44.83 | $31.15 | $75.98 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: CRANESENGI0003-009Base $64.70 + fringe $34.69 = you must pay at least $99.39/hr in wages + benefits. | $64.70 | $34.69 | $99.39 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: OILERENGI0003-009Base $42.83 + fringe $31.15 = you must pay at least $73.98/hr in wages + benefits. | $42.83 | $31.15 | $73.98 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: TRUCKENGI0003-009Base $45.07 + fringe $31.15 = you must pay at least $76.22/hr in wages + benefits. | $45.07 | $31.15 | $76.22 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: CRANESENGI0003-009Base $66.39 + fringe $34.69 = you must pay at least $101.08/hr in wages + benefits. | $66.39 | $34.69 | $101.08 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: OILERENGI0003-009Base $43.79 + fringe $31.15 = you must pay at least $74.94/hr in wages + benefits. | $43.79 | $31.15 | $74.94 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: TRUCKENGI0003-009Base $46.08 + fringe $31.15 = you must pay at least $77.23/hr in wages + benefits. | $46.08 | $31.15 | $77.23 |
Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similarENGI0003-009Base $54.69 + fringe $34.69 = you must pay at least $89.38/hr in wages + benefits. | $54.69 | $34.69 | $89.38 |
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit sharpener; Boiler tender; BoxENGI0003-009Base $56.71 + fringe $34.69 = you must pay at least $91.40/hr in wages + benefits. | $56.71 | $34.69 | $91.40 |
Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotatingENGI0003-009Base $57.79 + fringe $34.69 = you must pay at least $92.48/hr in wages + benefits. | $57.79 | $34.69 | $92.48 |
Armor-Coater (or similar); Ballast jack tamper; Boom-type backfilling machineENGI0003-009Base $58.88 + fringe $34.69 = you must pay at least $93.57/hr in wages + benefits. | $58.88 | $34.69 | $93.57 |
Cast-in-place pipe laying machine; Combination slusher and motor operatorENGI0003-009Base $60.15 + fringe $34.69 = you must pay at least $94.84/hr in wages + benefits. | $60.15 | $34.69 | $94.84 |
Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loaderENGI0003-009Base $61.36 + fringe $34.69 = you must pay at least $96.05/hr in wages + benefits. | $61.36 | $34.69 | $96.05 |
Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4ENGI0003-009Base $62.69 + fringe $34.69 = you must pay at least $97.38/hr in wages + benefits. | $62.69 | $34.69 | $97.38 |
Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. ydsENGI0003-009Base $64.09 + fringe $34.69 = you must pay at least $98.78/hr in wages + benefits. | $64.09 | $34.69 | $98.78 |
Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cuENGI0003-009Base $65.54 + fringe $34.69 = you must pay at least $100.23/hr in wages + benefits. | $65.54 | $34.69 | $100.23 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 4: CRANESENGI0003-010Base $37.86 + fringe $28.03 = you must pay at least $65.89/hr in wages + benefits. | $37.86 | $28.03 | $65.89 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: TRUCKENGI0003-010Base $37.58 + fringe $28.03 = you must pay at least $65.61/hr in wages + benefits. | $37.58 | $28.03 | $65.61 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: OILERENGI0003-010Base $35.11 + fringe $28.03 = you must pay at least $63.14/hr in wages + benefits. | $35.11 | $28.03 | $63.14 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: HYDRAULICENGI0003-010Base $37.20 + fringe $28.03 = you must pay at least $65.23/hr in wages + benefits. | $37.20 | $28.03 | $65.23 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: CRANESENGI0003-010Base $63.06 + fringe $34.69 = you must pay at least $97.75/hr in wages + benefits. | $63.06 | $34.69 | $97.75 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: TRUCKENGI0003-010Base $37.83 + fringe $28.03 = you must pay at least $65.86/hr in wages + benefits. | $37.83 | $28.03 | $65.86 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: OILERENGI0003-010Base $35.34 + fringe $28.03 = you must pay at least $63.37/hr in wages + benefits. | $35.34 | $28.03 | $63.37 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: CRANESENGI0003-010Base $64.70 + fringe $34.69 = you must pay at least $99.39/hr in wages + benefits. | $64.70 | $34.69 | $99.39 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: CRANESENGI0003-010Base $66.39 + fringe $34.69 = you must pay at least $101.08/hr in wages + benefits. | $66.39 | $34.69 | $101.08 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: OILERENGI0003-010Base $35.59 + fringe $28.03 = you must pay at least $63.62/hr in wages + benefits. | $35.59 | $28.03 | $63.62 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: TRUCKENGI0003-010Base $38.05 + fringe $28.03 = you must pay at least $66.08/hr in wages + benefits. | $38.05 | $28.03 | $66.08 |
Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similarENGI0003-010Base $54.69 + fringe $34.69 = you must pay at least $89.38/hr in wages + benefits. | $54.69 | $34.69 | $89.38 |
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit sharpener; Boiler tender; BoxENGI0003-010Base $56.71 + fringe $34.69 = you must pay at least $91.40/hr in wages + benefits. | $56.71 | $34.69 | $91.40 |
Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotatingENGI0003-010Base $57.79 + fringe $34.69 = you must pay at least $92.48/hr in wages + benefits. | $57.79 | $34.69 | $92.48 |
Armor-Coater (or similar); Ballast jack tamper; Boom- type backfilling machineENGI0003-010Base $58.88 + fringe $34.69 = you must pay at least $93.57/hr in wages + benefits. | $58.88 | $34.69 | $93.57 |
Cast-in-place pipe laying machine; Combination slusher and motor operatorENGI0003-010Base $60.15 + fringe $34.69 = you must pay at least $94.84/hr in wages + benefits. | $60.15 | $34.69 | $94.84 |
Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loaderENGI0003-010Base $61.36 + fringe $34.69 = you must pay at least $96.05/hr in wages + benefits. | $61.36 | $34.69 | $96.05 |
Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4ENGI0003-010Base $62.69 + fringe $34.69 = you must pay at least $97.38/hr in wages + benefits. | $62.69 | $34.69 | $97.38 |
Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. ydsENGI0003-010Base $64.09 + fringe $34.69 = you must pay at least $98.78/hr in wages + benefits. | $64.09 | $34.69 | $98.78 |
Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cuENGI0003-010Base $65.54 + fringe $34.69 = you must pay at least $100.23/hr in wages + benefits. | $65.54 | $34.69 | $100.23 |
GROUP 3 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 ASENGI0003-011Base $49.64 + fringe $28.56 = you must pay at least $78.20/hr in wages + benefits. | $49.64 | $28.56 | $78.20 |
GROUP 3 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SANENGI0003-011Base $47.64 + fringe $28.56 = you must pay at least $76.20/hr in wages + benefits. | $47.64 | $28.56 | $76.20 |
GROUP 2 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 ASENGI0003-011Base $54.25 + fringe $28.56 = you must pay at least $82.81/hr in wages + benefits. | $54.25 | $28.56 | $82.81 |
GROUP 2 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SANENGI0003-011Base $52.25 + fringe $28.56 = you must pay at least $80.81/hr in wages + benefits. | $52.25 | $28.56 | $80.81 |
GROUP 1 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 ASENGI0003-011Base $57.85 + fringe $28.56 = you must pay at least $86.41/hr in wages + benefits. | $57.85 | $28.56 | $86.41 |
GROUP 1 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SANENGI0003-011Base $55.85 + fringe $28.56 = you must pay at least $84.41/hr in wages + benefits. | $55.85 | $28.56 | $84.41 |
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURALIRON0377-001Base $55.33 + fringe $35.15 = you must pay at least $90.48/hr in wages + benefits. | $55.33 | $35.15 | $90.48 |
IRONWORKERS: FENCE ERECTORIRON0377-001Base $45.78 + fringe $26.51 = you must pay at least $72.29/hr in wages + benefits. | $45.78 | $26.51 | $72.29 |
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (SAN FRANCISCO CITY ANDIRON0377-003Base $55.83 + fringe $35.15 = you must pay at least $90.98/hr in wages + benefits. | $55.83 | $35.15 | $90.98 |
IRONWORKERS: FENCE ERECTOR (SAN FRANCISCO CITY AND COUNTY) PREMIUM $6.00IRON0377-003Base $45.78 + fringe $26.51 = you must pay at least $72.29/hr in wages + benefits. | $45.78 | $26.51 | $72.29 |
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL (REMAINING COUNTIES) PREMIUMIRON0433-005Base $50.70 + fringe $35.15 = you must pay at least $85.85/hr in wages + benefits. | $50.70 | $35.15 | $85.85 |
IRONWORKER: FENCE ERECTOR (REMAINING COUNTIES) PREMIUM $6.00 additional perIRON0433-005Base $45.78 + fringe $26.51 = you must pay at least $72.29/hr in wages + benefits. | $45.78 | $26.51 | $72.29 |
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2LABO0067-007Base $38.15 + fringe $30.03 = you must pay at least $68.18/hr in wages + benefits. | $38.15 | $30.03 | $68.18 |
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1LABO0067-007Base $39.15 + fringe $30.03 = you must pay at least $69.18/hr in wages + benefits. | $39.15 | $30.03 | $69.18 |
LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENTLABO0185-001Base $28.94 + fringe $27.30 = you must pay at least $56.24/hr in wages + benefits. | $28.94 | $27.30 | $56.24 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEWLABO0185-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
LABORERS:, WRECKING: GROUP 2 Semi-skilled wrecker (salvaging of other buildingLABO0185-001Base $35.35 + fringe $27.30 = you must pay at least $62.65/hr in wages + benefits. | $35.35 | $27.30 | $62.65 |
LABORERS:, WRECKING: GROUP 1 Skilled wreckerLABO0185-001Base $35.50 + fringe $27.30 = you must pay at least $62.80/hr in wages + benefits. | $35.50 | $27.30 | $62.80 |
LABORERS:, GUNITE: GROUP 4 GUNITE LABORERLABO0185-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
LABORERS:, GUNITE: GROUP 3 REBOUNDMANLABO0185-001Base $35.37 + fringe $27.30 = you must pay at least $62.67/hr in wages + benefits. | $35.37 | $27.30 | $62.67 |
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMANLABO0185-001Base $35.96 + fringe $27.30 = you must pay at least $63.26/hr in wages + benefits. | $35.96 | $27.30 | $63.26 |
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMANLABO0185-001Base $36.46 + fringe $27.30 = you must pay at least $63.76/hr in wages + benefits. | $36.46 | $27.30 | $63.76 |
ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TOLABO0185-001Base $28.94 + fringe $27.30 = you must pay at least $56.24/hr in wages + benefits. | $28.94 | $27.30 | $56.24 |
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTERLABO0185-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTERLABO0185-001Base $35.35 + fringe $27.30 = you must pay at least $62.65/hr in wages + benefits. | $35.35 | $27.30 | $62.65 |
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND INLABO0185-001Base $36.05 + fringe $27.30 = you must pay at least $63.35/hr in wages + benefits. | $36.05 | $27.30 | $63.35 |
BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICSLABO0185-001Base $35.55 + fringe $27.30 = you must pay at least $62.85/hr in wages + benefits. | $35.55 | $27.30 | $62.85 |
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLSLABO0185-001Base $35.72 + fringe $27.30 = you must pay at least $63.02/hr in wages + benefits. | $35.72 | $27.30 | $63.02 |
Asphalt spreader boxes (all types); Barko, Wacker and similar type tampersLABO0185-001Base $35.50 + fringe $27.30 = you must pay at least $62.80/hr in wages + benefits. | $35.50 | $27.30 | $62.80 |
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST: ASPHALT IRONERLABO0185-001Base $36.20 + fringe $27.30 = you must pay at least $63.50/hr in wages + benefits. | $36.20 | $27.30 | $63.50 |
LABORER: MASON TENDER-BRICKLABO0185-003Base $36.29 + fringe $25.55 = you must pay at least $61.84/hr in wages + benefits. | $36.29 | $25.55 | $61.84 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEWLABO0261-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENTLABO0261-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
LABORERS:, WRECKING: GROUP 2 SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDINGLABO0261-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
LABORERS:, WRECKING: GROUP 1 SKILLED WRECKERLABO0261-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
LABORERS:, GUNITE: GROUP 4 GUNITE LABORERLABO0261-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LABORERS:, GUNITE: GROUP 3 REBOUNDMANLABO0261-001Base $36.37 + fringe $27.30 = you must pay at least $63.67/hr in wages + benefits. | $36.37 | $27.30 | $63.67 |
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMANLABO0261-001Base $36.96 + fringe $27.30 = you must pay at least $64.26/hr in wages + benefits. | $36.96 | $27.30 | $64.26 |
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMANLABO0261-001Base $37.46 + fringe $27.30 = you must pay at least $64.76/hr in wages + benefits. | $37.46 | $27.30 | $64.76 |
ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TOLABO0261-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTERLABO0261-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTERLABO0261-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND INLABO0261-001Base $37.05 + fringe $27.30 = you must pay at least $64.35/hr in wages + benefits. | $37.05 | $27.30 | $64.35 |
BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICSLABO0261-001Base $36.55 + fringe $27.30 = you must pay at least $63.85/hr in wages + benefits. | $36.55 | $27.30 | $63.85 |
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLSLABO0261-001Base $36.72 + fringe $27.30 = you must pay at least $64.02/hr in wages + benefits. | $36.72 | $27.30 | $64.02 |
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERSLABO0261-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST: ASPHALT IRONERLABO0261-001Base $37.20 + fringe $27.30 = you must pay at least $64.50/hr in wages + benefits. | $37.20 | $27.30 | $64.50 |
LABORER: MASON TENDER-BRICK MARIN COUNTYLABO0261-008Base $37.54 + fringe $25.55 = you must pay at least $63.09/hr in wages + benefits. | $37.54 | $25.55 | $63.09 |
MASON TENDER, BRICK SAN FRANCISCO AND SAN MATEO COUNTIES FOOTNOTES: UNDERGROUNDLABO0261-011Base $37.05 + fringe $27.45 = you must pay at least $64.50/hr in wages + benefits. | $37.05 | $27.45 | $64.50 |
PLASTERER TENDERLABO0261-012Base $39.77 + fringe $28.54 = you must pay at least $68.31/hr in wages + benefits. | $39.77 | $28.54 | $68.31 |
PLASTER TENDER (SAN FRANCISCO AND SAN MATEO COUNTIES) WORK ON A SWING STAGELABO0261-013Base $41.93 + fringe $30.32 = you must pay at least $72.25/hr in wages + benefits. | $41.93 | $30.32 | $72.25 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: NEWLABO0270-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA BLABO0270-001Base $28.94 + fringe $27.30 = you must pay at least $56.24/hr in wages + benefits. | $28.94 | $27.30 | $56.24 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: NEWLABO0270-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA ALABO0270-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
Semi-skilled wrecker (salvaging of other building materials)LABO0270-001Base $35.35 + fringe $27.30 = you must pay at least $62.65/hr in wages + benefits. | $35.35 | $27.30 | $62.65 |
LABORERS:, WRECKING - AREA B: GROUP 1: Skilled wreckerLABO0270-001Base $35.50 + fringe $27.30 = you must pay at least $62.80/hr in wages + benefits. | $35.50 | $27.30 | $62.80 |
LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled wrecker (salvaging of otherLABO0270-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
LABORERS:, WRECKING - AREA A: GROUP 1: Skilled wreckerLABO0270-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
LABORERS:, GUNITE - AREA B: GROUP 4: GUNITE LABORERLABO0270-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
LABORERS:, GUNITE - AREA B: GROUP 3: REBOUNDMANLABO0270-001Base $35.37 + fringe $27.30 = you must pay at least $62.67/hr in wages + benefits. | $35.37 | $27.30 | $62.67 |
LABORERS:, GUNITE - AREA B: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GORUNDMANLABO0270-001Base $35.96 + fringe $27.30 = you must pay at least $63.26/hr in wages + benefits. | $35.96 | $27.30 | $63.26 |
LABORERS:, GUNITE - AREA B: GROUP 1: STRUCTURAL NOZZLEMANLABO0270-001Base $36.46 + fringe $27.30 = you must pay at least $63.76/hr in wages + benefits. | $36.46 | $27.30 | $63.76 |
LABORERS:, GUNITE - AREA A: GROUP 4: GUNITE LABORER (AREA ""A"" - SANTA CLARALABO0270-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LABORERS:, GUNITE - AREA A: GROUP 3: REBOUNDMAN (AREA ""A"" - SANTA CLARALABO0270-001Base $36.37 + fringe $27.30 = you must pay at least $63.67/hr in wages + benefits. | $36.37 | $27.30 | $63.67 |
LABORERS:, GUNITE - AREA A: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (AREALABO0270-001Base $36.96 + fringe $27.30 = you must pay at least $64.26/hr in wages + benefits. | $36.96 | $27.30 | $64.26 |
LABORERS:, GUNITE - AREA A: GROUP 1: STRUCTURAL NOZZLEMAN (AREA ""A"" - SANTALABO0270-001Base $37.46 + fringe $27.30 = you must pay at least $64.76/hr in wages + benefits. | $37.46 | $27.30 | $64.76 |
GROUP 4: All clean-up work of debris, grounds and building including but notLABO0270-001Base $28.94 + fringe $27.30 = you must pay at least $56.24/hr in wages + benefits. | $28.94 | $27.30 | $56.24 |
GROUP 3: Construction laborers, including bridge and general laborer; DumpLABO0270-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsumLABO0270-001Base $35.35 + fringe $27.30 = you must pay at least $62.65/hr in wages + benefits. | $35.35 | $27.30 | $62.65 |
GROUP 1-F: Wire winding machine in connection with guniting or shot creteLABO0270-001Base $36.08 + fringe $27.30 = you must pay at least $63.38/hr in wages + benefits. | $36.08 | $27.30 | $63.38 |
GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work onLABO0270-001Base $36.05 + fringe $27.30 = you must pay at least $63.35/hr in wages + benefits. | $36.05 | $27.30 | $63.35 |
GROUP 1-C: Burning and welding in connection with laborers' work; SyntheticLABO0270-001Base $35.55 + fringe $27.30 = you must pay at least $62.85/hr in wages + benefits. | $35.55 | $27.30 | $62.85 |
GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar typeLABO0270-001Base $35.72 + fringe $27.30 = you must pay at least $63.02/hr in wages + benefits. | $35.72 | $27.30 | $63.02 |
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar typeLABO0270-001Base $35.50 + fringe $27.30 = you must pay at least $62.80/hr in wages + benefits. | $35.50 | $27.30 | $62.80 |
CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam inLABO0270-001Base $36.20 + fringe $27.30 = you must pay at least $63.50/hr in wages + benefits. | $36.20 | $27.30 | $63.50 |
GROUP 4: All clean-up work of debris, grounds and building including but notLABO0270-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
GROUP 3: Construction laborers, including bridge and general laborer; DumpLABO0270-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsumLABO0270-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
GROUP 1-F: Wire winding machine in connection with guniting or shot creteLABO0270-001Base $37.08 + fringe $27.30 = you must pay at least $64.38/hr in wages + benefits. | $37.08 | $27.30 | $64.38 |
GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work onLABO0270-001Base $37.05 + fringe $27.30 = you must pay at least $64.35/hr in wages + benefits. | $37.05 | $27.30 | $64.35 |
GROUP 1-C: Burning and welding in connection with laborers' work; SyntheticLABO0270-001Base $36.55 + fringe $27.30 = you must pay at least $63.85/hr in wages + benefits. | $36.55 | $27.30 | $63.85 |
GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar typeLABO0270-001Base $36.72 + fringe $27.30 = you must pay at least $64.02/hr in wages + benefits. | $36.72 | $27.30 | $64.02 |
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar typeLABO0270-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam inLABO0270-001Base $37.20 + fringe $27.30 = you must pay at least $64.50/hr in wages + benefits. | $37.20 | $27.30 | $64.50 |
MASON TENDER, BRICK (SANTA CRUZ COUNTY)LABO0270-002Base $35.29 + fringe $26.85 = you must pay at least $62.14/hr in wages + benefits. | $35.29 | $26.85 | $62.14 |
MASON TENDER, BRICK (SANTA CLARA COUNTY)LABO0270-002Base $35.29 + fringe $26.85 = you must pay at least $62.14/hr in wages + benefits. | $35.29 | $26.85 | $62.14 |
LABORER: MASON TENDER-BRICK (MONTEREY AND SAN BENITO COUNTIES)LABO0270-006Base $36.29 + fringe $25.55 = you must pay at least $61.84/hr in wages + benefits. | $36.29 | $25.55 | $61.84 |
PLASTER TENDER (SANTA CLARA & SANTA CRUZ) WORK ON A SWING STAGE SCAFFOLD: $1.00LABO0270-008Base $40.68 + fringe $29.68 = you must pay at least $70.36/hr in wages + benefits. | $40.68 | $29.68 | $70.36 |
PLASTERER TENDER (MONTEREY AND SAN BENITO COUNTIES) WORK ON A SWING STAGELABO0270-009Base $40.68 + fringe $29.68 = you must pay at least $70.36/hr in wages + benefits. | $40.68 | $29.68 | $70.36 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEWLABO0304-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENTLABO0304-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
LABORERS:, WRECKING: GROUP 2 GROUP 2: Semi-skilled wrecker (salvaging of otherLABO0304-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
LABORERS:, WRECKING: GROUP 1 Skilled wreckerLABO0304-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER (ALAMEDA COUNTY)LABO0304-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN (ALAMEDA COUNTY)LABO0304-001Base $36.37 + fringe $27.30 = you must pay at least $63.67/hr in wages + benefits. | $36.37 | $27.30 | $63.67 |
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (ALAMEDA COUNTY)LABO0304-001Base $36.96 + fringe $27.30 = you must pay at least $64.26/hr in wages + benefits. | $36.96 | $27.30 | $64.26 |
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN (ALAMEDA COUNTY)LABO0304-001Base $37.46 + fringe $27.30 = you must pay at least $64.76/hr in wages + benefits. | $37.46 | $27.30 | $64.76 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4 ALL CLEAN-UP WORK OF DEBRISLABO0304-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3 CONSTRUCTION LABORERSLABO0304-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPERLABO0304-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-F WIRE WINDING MACHINE INLABO0304-001Base $37.08 + fringe $27.30 = you must pay at least $64.38/hr in wages + benefits. | $37.08 | $27.30 | $64.38 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E WORK ON AND/OR IN BELL HOLELABO0304-001Base $37.05 + fringe $27.30 = you must pay at least $64.35/hr in wages + benefits. | $37.05 | $27.30 | $64.35 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C BURNING AND WELDING INLABO0304-001Base $36.55 + fringe $27.30 = you must pay at least $63.85/hr in wages + benefits. | $36.55 | $27.30 | $63.85 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A JOY DRILL MODEL TWM-2ALABO0304-001Base $36.72 + fringe $27.30 = you must pay at least $64.02/hr in wages + benefits. | $36.72 | $27.30 | $64.02 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1 ASPHALT SPREADER BOXES (ALLLABO0304-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST ASPHALT IRONERLABO0304-001Base $37.20 + fringe $27.30 = you must pay at least $64.50/hr in wages + benefits. | $37.20 | $27.30 | $64.50 |
BRICK TENDER (ALAMEDA COUNTY) FOOTNOTES: WORK ON JOBS WHERE HEAT-PROTECTIVELABO0304-006Base $37.05 + fringe $27.45 = you must pay at least $64.50/hr in wages + benefits. | $37.05 | $27.45 | $64.50 |
PLASTERER TENDER (ALAMEDA AND CONTRA COSTA COUNTIES) WORK ON A SWING STAGELABO0304-007Base $41.93 + fringe $30.32 = you must pay at least $72.25/hr in wages + benefits. | $41.93 | $30.32 | $72.25 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: NEWLABO0324-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA BLABO0324-001Base $28.94 + fringe $27.30 = you must pay at least $56.24/hr in wages + benefits. | $28.94 | $27.30 | $56.24 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: NEWLABO0324-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA ALABO0324-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
LABORERS:, WRECKING - AREA B: GROUP 2: Semi-skilled wrecker (salvaging of otherLABO0324-001Base $35.35 + fringe $27.30 = you must pay at least $62.65/hr in wages + benefits. | $35.35 | $27.30 | $62.65 |
LABORERS:, WRECKING - AREA B: GROUP 1: Skilled wreckerLABO0324-001Base $35.50 + fringe $27.30 = you must pay at least $62.80/hr in wages + benefits. | $35.50 | $27.30 | $62.80 |
LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled wrecker (salvaging of otherLABO0324-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
LABORERS:, WRECKING - AREA A: GROUP 1: Skilled wreckerLABO0324-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
LABORERS:, GUNITE - AREA B: GROUP 4: Gunite laborerLABO0324-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
LABORERS:, GUNITE - AREA B: GROUP 3: ReboundmanLABO0324-001Base $35.37 + fringe $27.30 = you must pay at least $62.67/hr in wages + benefits. | $35.37 | $27.30 | $62.67 |
LABORERS:, GUNITE - AREA B: GROUP 2: Nozzleman, Gunman, Potman, GroundmanLABO0324-001Base $35.96 + fringe $27.30 = you must pay at least $63.26/hr in wages + benefits. | $35.96 | $27.30 | $63.26 |
LABORERS:, GUNITE - AREA B: GROUP 1: Structural nozzleman (AREA ""A"" - CONTRALABO0324-001Base $36.46 + fringe $27.30 = you must pay at least $63.76/hr in wages + benefits. | $36.46 | $27.30 | $63.76 |
LABORERS:, GUNITE - AREA A: GROUP 4: Gunite laborer (AREA ""A"" - CONTRA COSTALABO0324-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LABORERS:, GUNITE - AREA A: GROUP 3: Reboundman (AREA ""A"" - CONTRA COSTALABO0324-001Base $36.37 + fringe $27.30 = you must pay at least $63.67/hr in wages + benefits. | $36.37 | $27.30 | $63.67 |
LABORERS:, GUNITE - AREA A: GROUP 2: Nozzleman, Gunman, Potman, Groundman (AREALABO0324-001Base $36.96 + fringe $27.30 = you must pay at least $64.26/hr in wages + benefits. | $36.96 | $27.30 | $64.26 |
LABORERS:, GUNITE - AREA A: GROUP 1: Structural nozzleman (AREA ""A"" - CONTRALABO0324-001Base $37.46 + fringe $27.30 = you must pay at least $64.76/hr in wages + benefits. | $37.46 | $27.30 | $64.76 |
GROUP 4: All clean-up work of debris, grounds and building including but notLABO0324-001Base $28.94 + fringe $27.30 = you must pay at least $56.24/hr in wages + benefits. | $28.94 | $27.30 | $56.24 |
GROUP 3: Construction laborers, including bridge and general laborer; DumpLABO0324-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsumLABO0324-001Base $35.35 + fringe $27.30 = you must pay at least $62.65/hr in wages + benefits. | $35.35 | $27.30 | $62.65 |
GROUP 1-F: Wire winding machine in connection with guniting or shot creteLABO0324-001Base $36.08 + fringe $27.30 = you must pay at least $63.38/hr in wages + benefits. | $36.08 | $27.30 | $63.38 |
GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work onLABO0324-001Base $36.05 + fringe $27.30 = you must pay at least $63.35/hr in wages + benefits. | $36.05 | $27.30 | $63.35 |
GROUP 1-C: Burning and welding in connection with laborers' work; SyntheticLABO0324-001Base $35.55 + fringe $27.30 = you must pay at least $62.85/hr in wages + benefits. | $35.55 | $27.30 | $62.85 |
GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar typeLABO0324-001Base $35.72 + fringe $27.30 = you must pay at least $63.02/hr in wages + benefits. | $35.72 | $27.30 | $63.02 |
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar typeLABO0324-001Base $35.50 + fringe $27.30 = you must pay at least $62.80/hr in wages + benefits. | $35.50 | $27.30 | $62.80 |
CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam inLABO0324-001Base $36.20 + fringe $27.30 = you must pay at least $63.50/hr in wages + benefits. | $36.20 | $27.30 | $63.50 |
GROUP 4: All clean-up work of debris, grounds and building including but notLABO0324-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
GROUP 3: Construction laborers, including bridge and general laborer; DumpLABO0324-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUMLABO0324-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
GROUP 1-G CONTRA COSTA COUNTY: PipelayerLABO0324-001Base $36.70 + fringe $27.30 = you must pay at least $64.00/hr in wages + benefits. | $36.70 | $27.30 | $64.00 |
GROUP 1-F: Wire winding machine in connection with guniting or shot crete (AREALABO0324-001Base $37.08 + fringe $27.30 = you must pay at least $64.38/hr in wages + benefits. | $37.08 | $27.30 | $64.38 |
GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ONLABO0324-001Base $37.05 + fringe $27.30 = you must pay at least $64.35/hr in wages + benefits. | $37.05 | $27.30 | $64.35 |
GROUP 1-CLABO0324-001Base $36.55 + fringe $27.30 = you must pay at least $63.85/hr in wages + benefits. | $36.55 | $27.30 | $63.85 |
GROUP 1-A OY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPELABO0324-001Base $36.72 + fringe $27.30 = you must pay at least $64.02/hr in wages + benefits. | $36.72 | $27.30 | $64.02 |
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar typeLABO0324-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
CONSTRUCTION SPECIALIST Asphalt ironer and raker; Chainsaw; Laser beam inLABO0324-001Base $37.20 + fringe $27.30 = you must pay at least $64.50/hr in wages + benefits. | $37.20 | $27.30 | $64.50 |
LABORER: MASON TENDER-BRICK (SOLANO AND SONOMA COUNTIES)LABO0324-011Base $36.84 + fringe $26.24 = you must pay at least $63.08/hr in wages + benefits. | $36.84 | $26.24 | $63.08 |
WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOURLABO0324-015Base $37.05 + fringe $27.45 = you must pay at least $64.50/hr in wages + benefits. | $37.05 | $27.45 | $64.50 |
PLASTER TENDERLABO0324-017Base $39.77 + fringe $28.54 = you must pay at least $68.31/hr in wages + benefits. | $39.77 | $28.54 | $68.31 |
PAINTERS: BRUSHPAIN0016-002Base $43.45 + fringe $22.80 = you must pay at least $66.25/hr in wages + benefits. | $43.45 | $22.80 | $66.25 |
SOFT FLOOR LAYERPAIN0016-009Base $59.00 + fringe $33.03 = you must pay at least $92.03/hr in wages + benefits. | $59.00 | $33.03 | $92.03 |
DRYWALL FINISHER/TAPER: (AREA 2) AREA 2: EL DORADO COUNTY, MONTEREY, PLACERPAIN0016-011Base $59.63 + fringe $31.29 = you must pay at least $90.92/hr in wages + benefits. | $59.63 | $31.29 | $90.92 |
DRYWALL FINISHER/TAPER: (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, NAPA, SANPAIN0016-011Base $63.76 + fringe $32.69 = you must pay at least $96.45/hr in wages + benefits. | $63.76 | $32.69 | $96.45 |
PAINTERPAIN0016-013Base $53.38 + fringe $28.04 = you must pay at least $81.42/hr in wages + benefits. | $53.38 | $28.04 | $81.42 |
PAINTER (SAN FRANCISCO COUNTY)PAIN0016-019Base $57.00 + fringe $28.04 = you must pay at least $85.04/hr in wages + benefits. | $57.00 | $28.04 | $85.04 |
GLAZIERPAIN0169-006Base $56.22 + fringe $34.00 = you must pay at least $90.22/hr in wages + benefits. | $56.22 | $34.00 | $90.22 |
PAINTER: SPRAY PAINTER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY &PAIN0567-002Base $41.43 + fringe $16.16 = you must pay at least $57.59/hr in wages + benefits. | $41.43 | $16.16 | $57.59 |
PAINTER: PAPER HANGER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY &PAIN0567-002Base $42.19 + fringe $16.16 = you must pay at least $58.35/hr in wages + benefits. | $42.19 | $16.16 | $58.35 |
PAINTER: BRUSH AND ROLLER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY &PAIN0567-002Base $39.43 + fringe $16.16 = you must pay at least $55.59/hr in wages + benefits. | $39.43 | $16.16 | $55.59 |
SOFT FLOOR LAYER (EL DORADO AND PLACER COUNTIES)PAIN0567-008Base $34.27 + fringe $16.47 = you must pay at least $50.74/hr in wages + benefits. | $34.27 | $16.47 | $50.74 |
DRYWALL FINISHER/TAPER (EL DORADO AND PLACER COUNTIES) STEEPLEJACK-DRYWALLPAIN0567-011Base $42.79 + fringe $16.12 = you must pay at least $58.91/hr in wages + benefits. | $42.79 | $16.12 | $58.91 |
GLAZIERPAIN0767-002Base $43.25 + fringe $35.62 = you must pay at least $78.87/hr in wages + benefits. | $43.25 | $35.62 | $78.87 |
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVEPAIN1176-001Base $35.11 + fringe $17.62 = you must pay at least $52.73/hr in wages + benefits. | $35.11 | $17.62 | $52.73 |
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPERPAIN1176-001Base $40.83 + fringe $17.62 = you must pay at least $58.45/hr in wages + benefits. | $40.83 | $17.62 | $58.45 |
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT &PAIN1176-001Base $34.71 + fringe $17.62 = you must pay at least $52.33/hr in wages + benefits. | $34.71 | $17.62 | $52.33 |
SOFT FLOOR LAYERPAIN1237-002Base $48.54 + fringe $26.59 = you must pay at least $75.13/hr in wages + benefits. | $48.54 | $26.59 | $75.13 |
PLASTERERPLAS0066-001Base $42.41 + fringe $30.73 = you must pay at least $73.14/hr in wages + benefits. | $42.41 | $30.73 | $73.14 |
PLASTERER (AREA 355: MARIN COUNTY)PLAS0300-002Base $36.73 + fringe $31.68 = you must pay at least $68.41/hr in wages + benefits. | $36.73 | $31.68 | $68.41 |
PLASTERER (AREA 337: MONTEREY COUNTY)PLAS0300-002Base $32.88 + fringe $31.68 = you must pay at least $64.56/hr in wages + benefits. | $32.88 | $31.68 | $64.56 |
PLASTERERPLAS0300-002Base $32.70 + fringe $31.68 = you must pay at least $64.38/hr in wages + benefits. | $32.70 | $31.68 | $64.38 |
PLASTERERPLAS0300-002Base $32.88 + fringe $31.68 = you must pay at least $64.56/hr in wages + benefits. | $32.88 | $31.68 | $64.56 |
CEMENT MASON/CONCRETE FINISHERPLAS0300-005Base $32.15 + fringe $23.27 = you must pay at least $55.42/hr in wages + benefits. | $32.15 | $23.27 | $55.42 |
PLUMBER, STEAMFITTER, REFRIGERATION FITTER: (2) NEW CONSTRUCTION IN SANPLUM0038-003Base $91.00 + fringe $49.49 = you must pay at least $140.49/hr in wages + benefits. | $91.00 | $49.49 | $140.49 |
PLUMBER, STEAMFITTER, REFRIGERATION FITTER: (1) Wood Frame Construction in SanPLUM0038-003Base $82.00 + fringe $48.18 = you must pay at least $130.18/hr in wages + benefits. | $82.00 | $48.18 | $130.18 |
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER (MARIN, SAN FRANCISCO &PLUM0038-007Base $77.35 + fringe $36.53 = you must pay at least $113.88/hr in wages + benefits. | $77.35 | $36.53 | $113.88 |
PLUMBER & STEAMFITTER (MONTEREY AND SANTA CRUZ COUNTIES)PLUM0062-001Base $57.75 + fringe $43.60 = you must pay at least $101.35/hr in wages + benefits. | $57.75 | $43.60 | $101.35 |
PLUMBER, PIPEFITTER, STEAMFITTER (CONTRA COSTA COUNTY)PLUM0159-002Base $43.72 + fringe $20.29 = you must pay at least $64.01/hr in wages + benefits. | $43.72 | $20.29 | $64.01 |
PLUMBER (SUTTER & YUBA COUNTIES)PLUM0228-002Base $52.75 + fringe $41.39 = you must pay at least $94.14/hr in wages + benefits. | $52.75 | $41.39 | $94.14 |
PLUMBER & STEAMFITTER (ALAMEDA COUNTY)PLUM0342-002Base $80.50 + fringe $50.45 = you must pay at least $130.95/hr in wages + benefits. | $80.50 | $50.45 | $130.95 |
PLUMBERS AND PIPEFITTERS (NAPA AND SOLANO COUNTIES) FOOTNOTES: WORK FROMPLUM0343-002Base $37.35 + fringe $21.15 = you must pay at least $58.50/hr in wages + benefits. | $37.35 | $21.15 | $58.50 |
PLUMBERS AND PIPEFITTERSPLUM0350-002Base $52.14 + fringe $18.71 = you must pay at least $70.85/hr in wages + benefits. | $52.14 | $18.71 | $70.85 |
UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTERPLUM0355-002Base $36.01 + fringe $18.50 = you must pay at least $54.51/hr in wages + benefits. | $36.01 | $18.50 | $54.51 |
PLUMBERS AND PIPEFITTERS (SAN BENITO & SANTA CLARA COUNTIES)PLUM0393-002Base $30.90 + fringe $7.90 = you must pay at least $38.80/hr in wages + benefits. | $30.90 | $7.90 | $38.80 |
PLUMBERS AND PIPEFITTERSPLUM0447-003Base $55.58 + fringe $24.02 = you must pay at least $79.60/hr in wages + benefits. | $55.58 | $24.02 | $79.60 |
PLUMBER/PIPEFITTER/STEAMFITTER (SAN MATEO COUNTY)PLUM0467-001Base $87.75 + fringe $41.44 = you must pay at least $129.19/hr in wages + benefits. | $87.75 | $41.44 | $129.19 |
ROOFER (SAN FRANCISCO & SAN MATEO COUNTIES)ROOF0040-001Base $55.30 + fringe $22.97 = you must pay at least $78.27/hr in wages + benefits. | $55.30 | $22.97 | $78.27 |
ROOFERROOF0081-003Base $54.94 + fringe $23.34 = you must pay at least $78.28/hr in wages + benefits. | $54.94 | $23.34 | $78.28 |
ROOFERROOF0081-005Base $46.73 + fringe $21.36 = you must pay at least $68.09/hr in wages + benefits. | $46.73 | $21.36 | $68.09 |
ROOFER: KETTLE PERSON (2 KETTLES)ROOF0095-001Base $55.17 + fringe $21.51 = you must pay at least $76.68/hr in wages + benefits. | $55.17 | $21.51 | $76.68 |
ROOFER: JOURNEYMANROOF0095-001Base $53.17 + fringe $21.51 = you must pay at least $74.68/hr in wages + benefits. | $53.17 | $21.51 | $74.68 |
ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKERROOF0095-001Base $57.17 + fringe $21.51 = you must pay at least $78.68/hr in wages + benefits. | $57.17 | $21.51 | $78.68 |
SPRINKLER FITTERSFCA0483-002Base $49.82 + fringe $18.05 = you must pay at least $67.87/hr in wages + benefits. | $49.82 | $18.05 | $67.87 |
SPRINKLER FITTERSFCA0669-006Base $49.69 + fringe $29.72 = you must pay at least $79.41/hr in wages + benefits. | $49.69 | $29.72 | $79.41 |
SPRINKLER FITTERSFCA0669-012Base $52.06 + fringe $29.86 = you must pay at least $81.92/hr in wages + benefits. | $52.06 | $29.86 | $81.92 |
SHEET METAL WORKER: (AREA 2) AREA 2: MONTEREY & SAN BENITOSHEE0104-002Base $60.64 + fringe $39.04 = you must pay at least $99.68/hr in wages + benefits. | $60.64 | $39.04 | $99.68 |
SHEET METAL WORKER: (AREA 3) AREA 3: SANTA CRUZSHEE0104-002Base $55.16 + fringe $34.18 = you must pay at least $89.34/hr in wages + benefits. | $55.16 | $34.18 | $89.34 |
SHEET METAL WORKER: (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SANSHEE0104-002Base $67.03 + fringe $50.79 = you must pay at least $117.82/hr in wages + benefits. | $67.03 | $50.79 | $117.82 |
SHEET METAL WORKERSHEE0104-017Base $30.29 + fringe $16.41 = you must pay at least $46.70/hr in wages + benefits. | $30.29 | $16.41 | $46.70 |
TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND OVER; HOLLAND HAULER; LOW BEDTEAM0094-001Base $44.56 + fringe $34.28 = you must pay at least $78.84/hr in wages + benefits. | $44.56 | $34.28 | $78.84 |
TRUCK DRIVERS: GROUP 4: DUMP TRUCKS, OVER 25 YDS. AND UNDER 65 YDS.; WATERTEAM0094-001Base $44.21 + fringe $34.28 = you must pay at least $78.49/hr in wages + benefits. | $44.21 | $34.28 | $78.49 |
TRUCK DRIVERS: GROUP 3: DUMP TRUCKS, 8 YDS. AND INCLUDING 24 YDS.; TRANSITTEAM0094-001Base $43.86 + fringe $34.28 = you must pay at least $78.14/hr in wages + benefits. | $43.86 | $34.28 | $78.14 |
TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND UNDER 8 YDS.; TRANSIT MIXERSTEAM0094-001Base $43.56 + fringe $34.28 = you must pay at least $77.84/hr in wages + benefits. | $43.56 | $34.28 | $77.84 |
TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK (2TEAM0094-001Base $43.26 + fringe $34.28 = you must pay at least $77.54/hr in wages + benefits. | $43.26 | $34.28 | $77.54 |
Am I compliant?
Pick the classification and enter what you pay per hour — base wage plus cash fringe or benefit contributions. The math happens right here on this page.
Informational only — this check compares your combined hourly base + fringe against the determination's combined rate. Verify with the contracting agency before relying on it.
How to read this wage determination
The wage determination shows base hourly rates and fringe rates by classification. You must pay the total (base + fringe) as the floor. This can be cash wages, qualifying benefits, or a mix — but the combined value must meet or exceed the total. If the fringe column shows '*', this means the rate is defined elsewhere (often a collective bargaining agreement). Never treat '*' as $0 — you must locate the correct source to calculate the full obligation.
Counties listed are where these rates apply. Construction type (building, residential, heavy, or highway) dictates which rates to use. A highway project in County A uses different rates than a building project in the same county. Always match the project type exactly.
The revision number (e.g., "Mod 5") tracks updates. Only the wage determination attached to your contract is legally binding — even if newer versions exist. Verify the revision number in your contract documents. PrevailMap caches federal WDs for reference, but your contractual WD controls. This is informational, not legal advice.
New to this? How federal Davis-Bacon prevailing wage works →
Related California determinations near here
What this means for your payroll
On covered federal jobs, you must pay the full prevailing wage (base rate + fringe) to laborers and mechanics weekly. The obligation is the total rate — you can meet it with cash wages, bona fide benefits, or a mix. Every week, submit certified payroll (federal form WH-347) with a signed Statement of Compliance. Missing either is a violation.
If you’d rather not prepare the WH-347 and Statement of Compliance manually, WageSeal (from our team) generates them automatically. This isn’t legal advice — always confirm requirements with your contract or advisor.
Source: SAM.gov wage determination CA20260019, revision 5, published May 18, 2026. Rates are cached and refreshed daily from SAM.gov (last verified August 13, 2026). Always confirm the determination attached to your contract.