CA20260019
Alameda, Contra Costa, El Dorado, Marin, Monterey, Napa, Placer, Sacramento, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz, Solano, Sonoma, Sutter, Yolo & Yuba Counties, California
Revision 5 · Published May 18, 2026 · 343 classifications · Residential construction · Latest cached revision
Showing 343 of 343 classifications
| Classification | Base | Fringe | Total |
|---|---|---|---|
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATINGASBE0016-002Base $64.56 + fringe $25.07 = you must pay at least $89.63/hr in wages + benefits. | $64.56 | $25.07 | $89.63 |
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATINGASBE0016-002Base $84.76 + fringe $25.07 = you must pay at least $109.83/hr in wages + benefits. | $84.76 | $25.07 | $109.83 |
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMINGASBE0016-009Base $34.56 + fringe $11.40 = you must pay at least $45.96/hr in wages + benefits. | $34.56 | $11.40 | $45.96 |
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMINGASBE0016-009Base $36.53 + fringe $9.27 = you must pay at least $45.80/hr in wages + benefits. | $36.53 | $9.27 | $45.80 |
MARBLE FINISHERBRCA0003-001Base $42.06 + fringe $19.80 = you must pay at least $61.86/hr in wages + benefits. | $42.06 | $19.80 | $61.86 |
BRICKLAYER: (16) MONTEREY, SANTA CRUZ SPECIALTY PAY: (A) UNDERGROUND WORK SUCHBRCA0003-002Base $54.18 + fringe $27.82 = you must pay at least $82.00/hr in wages + benefits. | $54.18 | $27.82 | $82.00 |
BRICKLAYER: ( 9) EL DORADO, PLACER, SACRAMENTO, SUTTER SPECIALTY PAY: (A)BRCA0003-002Base $52.76 + fringe $25.01 = you must pay at least $77.77/hr in wages + benefits. | $52.76 | $25.01 | $77.77 |
BRICKLAYER: ( 8) ALAMEDA, CONTRA COSTA, SAN BENITO, SANTA CLARA SPECIALTY PAYBRCA0003-002Base $56.94 + fringe $26.28 = you must pay at least $83.22/hr in wages + benefits. | $56.94 | $26.28 | $83.22 |
BRICKLAYER: ( 7) MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SOLANO, SONOMABRCA0003-002Base $57.02 + fringe $28.50 = you must pay at least $85.52/hr in wages + benefits. | $57.02 | $28.50 | $85.52 |
$1.00 PER HOUR ADDITIONALBRCA0003-007Base $60.58 + fringe $29.79 = you must pay at least $90.37/hr in wages + benefits. | $60.58 | $29.79 | $90.37 |
TERRAZZO FINISHERBRCA0003-007Base $44.93 + fringe $20.98 = you must pay at least $65.91/hr in wages + benefits. | $44.93 | $20.98 | $65.91 |
MARBLE MASONBRCA0003-009Base $61.72 + fringe $30.31 = you must pay at least $92.03/hr in wages + benefits. | $61.72 | $30.31 | $92.03 |
TILE LAYER (SONOMA)BRCA0003-012Base $56.79 + fringe $22.54 = you must pay at least $79.33/hr in wages + benefits. | $56.79 | $22.54 | $79.33 |
TILE LAYERBRCA0003-012Base $55.55 + fringe $21.08 = you must pay at least $76.63/hr in wages + benefits. | $55.55 | $21.08 | $76.63 |
TILE LAYERBRCA0003-012Base $59.92 + fringe $22.62 = you must pay at least $82.54/hr in wages + benefits. | $59.92 | $22.62 | $82.54 |
TILE FINISHER (SONOMA)BRCA0003-012Base $35.78 + fringe $19.23 = you must pay at least $55.01/hr in wages + benefits. | $35.78 | $19.23 | $55.01 |
TILE FINISHERBRCA0003-012Base $35.00 + fringe $17.44 = you must pay at least $52.44/hr in wages + benefits. | $35.00 | $17.44 | $52.44 |
TILE FINISHERBRCA0003-012Base $37.75 + fringe $19.28 = you must pay at least $57.03/hr in wages + benefits. | $37.75 | $19.28 | $57.03 |
CARPENTERS: MILLWRIGHT (SAN FRANCISCO COUNTY)CARP0022-001Base $60.49 + fringe $35.11 = you must pay at least $95.60/hr in wages + benefits. | $60.49 | $35.11 | $95.60 |
CARPENTERS: JOURNEYMAN CARPENTER (SAN FRANCISCO COUNTY)CARP0022-001Base $60.39 + fringe $33.52 = you must pay at least $93.91/hr in wages + benefits. | $60.39 | $33.52 | $93.91 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0022-001Base $60.54 + fringe $33.52 = you must pay at least $94.06/hr in wages + benefits. | $60.54 | $33.52 | $94.06 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN FRANCISCO COUNTY)CARP0022-001Base $60.39 + fringe $33.52 = you must pay at least $93.91/hr in wages + benefits. | $60.39 | $33.52 | $93.91 |
DRYWALL STOCKER/SCRAPPER: (AREA 4) AREA 4: El Dorado, Placer, SacramentoCARP0035-005Base $24.07 + fringe $18.58 = you must pay at least $42.65/hr in wages + benefits. | $24.07 | $18.58 | $42.65 |
Monterey, San Benito & Santa Cruz CountiesCARP0035-005Base $24.49 + fringe $18.58 = you must pay at least $43.07/hr in wages + benefits. | $24.49 | $18.58 | $43.07 |
Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa ClaraCARP0035-005Base $27.43 + fringe $18.58 = you must pay at least $46.01/hr in wages + benefits. | $27.43 | $18.58 | $46.01 |
DRYWALL INSTALLERS/LATHERS: (AREA 4) AREA 4: El Dorado, Placer, SacramentoCARP0035-005Base $48.12 + fringe $31.93 = you must pay at least $80.05/hr in wages + benefits. | $48.12 | $31.93 | $80.05 |
Monterey, San Benito & Santa Cruz CountiesCARP0035-005Base $48.97 + fringe $31.93 = you must pay at least $80.90/hr in wages + benefits. | $48.97 | $31.93 | $80.90 |
Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa ClaraCARP0035-005Base $54.85 + fringe $31.93 = you must pay at least $86.78/hr in wages + benefits. | $54.85 | $31.93 | $86.78 |
CARPENTER: MILLWRIGHT MARIN COUNTYCARP0035-009Base $52.75 + fringe $32.41 = you must pay at least $85.16/hr in wages + benefits. | $52.75 | $32.41 | $85.16 |
CARPENTER: JOURNEYMAN CARPENTER MARIN COUNTYCARP0035-009Base $52.65 + fringe $30.82 = you must pay at least $83.47/hr in wages + benefits. | $52.65 | $30.82 | $83.47 |
CARPENTER: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0035-009Base $52.80 + fringe $30.82 = you must pay at least $83.62/hr in wages + benefits. | $52.80 | $30.82 | $83.62 |
CARPENTER: BRIDGE BUILDER/HIGHWAY CARPENTER MARIN COUNTYCARP0035-009Base $52.65 + fringe $30.82 = you must pay at least $83.47/hr in wages + benefits. | $52.65 | $30.82 | $83.47 |
CARPENTERS: MILLWRIGHT EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLOCARP0046-001Base $57.01 + fringe $35.11 = you must pay at least $92.12/hr in wages + benefits. | $57.01 | $35.11 | $92.12 |
CARPENTERS: JOURNEYMAN CARPENTER EL DORADO (WEST), PLACER (WEST), SACRAMENTOCARP0046-001Base $54.51 + fringe $33.52 = you must pay at least $88.03/hr in wages + benefits. | $54.51 | $33.52 | $88.03 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0046-001Base $54.66 + fringe $33.52 = you must pay at least $88.18/hr in wages + benefits. | $54.66 | $33.52 | $88.18 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER EL DORADO (WEST), PLACER (WEST)CARP0046-001Base $60.39 + fringe $33.52 = you must pay at least $93.91/hr in wages + benefits. | $60.39 | $33.52 | $93.91 |
CARPENTERS: MILLWRIGHT (EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBACARP0046-003Base $55.66 + fringe $35.11 = you must pay at least $90.77/hr in wages + benefits. | $55.66 | $35.11 | $90.77 |
CARPENTERS: JOURNEYMAN CARPENTER (EL DORADO (EAST), PLACER (EAST), SUTTER ANDCARP0046-003Base $53.16 + fringe $33.52 = you must pay at least $86.68/hr in wages + benefits. | $53.16 | $33.52 | $86.68 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0046-003Base $53.31 + fringe $33.52 = you must pay at least $86.83/hr in wages + benefits. | $53.31 | $33.52 | $86.83 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (EL DORADO (EAST), PLACER (EAST)CARP0046-003Base $60.39 + fringe $33.52 = you must pay at least $93.91/hr in wages + benefits. | $60.39 | $33.52 | $93.91 |
CARPENTERS: MILLWRIGHT (CONTRA COSTA COUNTY)CARP0152-001Base $52.75 + fringe $32.41 = you must pay at least $85.16/hr in wages + benefits. | $52.75 | $32.41 | $85.16 |
CARPENTERS: JOURNEYMAN CARPENTER (CONTRA COSTA COUNTY)CARP0152-001Base $52.65 + fringe $30.82 = you must pay at least $83.47/hr in wages + benefits. | $52.65 | $30.82 | $83.47 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0152-001Base $52.80 + fringe $30.82 = you must pay at least $83.62/hr in wages + benefits. | $52.80 | $30.82 | $83.62 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (CONTRA COSTA COUNTY)CARP0152-001Base $52.65 + fringe $30.82 = you must pay at least $83.47/hr in wages + benefits. | $52.65 | $30.82 | $83.47 |
CARPENTERS: MILLWRIGHT SOLANO COUNTYCARP0180-001Base $54.95 + fringe $33.08 = you must pay at least $88.03/hr in wages + benefits. | $54.95 | $33.08 | $88.03 |
CARPENTERS: JOURNEYMAN CARPENTER SOLANO COUNTYCARP0180-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0180-001Base $55.00 + fringe $31.49 = you must pay at least $86.49/hr in wages + benefits. | $55.00 | $31.49 | $86.49 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER SOLANO COUNTYCARP0180-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: MILLWRIGHT (SAN MATEO COUNTY)CARP0217-001Base $60.49 + fringe $35.11 = you must pay at least $95.60/hr in wages + benefits. | $60.49 | $35.11 | $95.60 |
CARPENTERS: JOURNEYMAN CARPENTER (SAN MATEO COUNTY)CARP0217-001Base $60.39 + fringe $33.52 = you must pay at least $93.91/hr in wages + benefits. | $60.39 | $33.52 | $93.91 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0217-001Base $60.54 + fringe $33.52 = you must pay at least $94.06/hr in wages + benefits. | $60.54 | $33.52 | $94.06 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN MATEO COUNTY)CARP0217-001Base $60.39 + fringe $33.52 = you must pay at least $93.91/hr in wages + benefits. | $60.39 | $33.52 | $93.91 |
CARPENTERS: MILLWRIGHT (SANTA CLARA COUNTY)CARP0405-001Base $54.95 + fringe $33.08 = you must pay at least $88.03/hr in wages + benefits. | $54.95 | $33.08 | $88.03 |
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CLARA COUNTY)CARP0405-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0405-001Base $55.00 + fringe $31.49 = you must pay at least $86.49/hr in wages + benefits. | $55.00 | $31.49 | $86.49 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA CLARA COUNTY)CARP0405-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: MILLWRIGHT (SAN BENITO COUNTY)CARP0405-002Base $51.47 + fringe $33.08 = you must pay at least $84.55/hr in wages + benefits. | $51.47 | $33.08 | $84.55 |
CARPENTERS: JOURNEYMAN CARPENTER (SAN BENITO COUNTY)CARP0405-002Base $48.97 + fringe $31.49 = you must pay at least $80.46/hr in wages + benefits. | $48.97 | $31.49 | $80.46 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0405-002Base $49.12 + fringe $31.49 = you must pay at least $80.61/hr in wages + benefits. | $49.12 | $31.49 | $80.61 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN BENITO COUNTY)CARP0405-002Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: MILLWRIGHT (SANTA CRUZ COUNTY)CARP0505-001Base $51.47 + fringe $33.08 = you must pay at least $84.55/hr in wages + benefits. | $51.47 | $33.08 | $84.55 |
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CRUZ COUNTY)CARP0505-001Base $48.97 + fringe $31.49 = you must pay at least $80.46/hr in wages + benefits. | $48.97 | $31.49 | $80.46 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0505-001Base $49.12 + fringe $31.49 = you must pay at least $80.61/hr in wages + benefits. | $49.12 | $31.49 | $80.61 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA CRUZ COUNTY)CARP0505-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: MILLWRIGHT (MONTEREY COUNTY)CARP0605-001Base $51.47 + fringe $33.08 = you must pay at least $84.55/hr in wages + benefits. | $51.47 | $33.08 | $84.55 |
CARPENTERS: JOURNEYMAN CARPENTER (MONTEREY COUNTY)CARP0605-001Base $48.97 + fringe $31.49 = you must pay at least $80.46/hr in wages + benefits. | $48.97 | $31.49 | $80.46 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0605-001Base $49.12 + fringe $31.49 = you must pay at least $80.61/hr in wages + benefits. | $49.12 | $31.49 | $80.61 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (MONTEREY COUNTY)CARP0605-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: MILLWRIGHT (ALAMEDA COUNTY)CARP0713-001Base $54.95 + fringe $33.08 = you must pay at least $88.03/hr in wages + benefits. | $54.95 | $33.08 | $88.03 |
CARPENTERS: JOURNEYMAN CARPENTER (ALAMEDA COUNTY)CARP0713-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0713-001Base $55.00 + fringe $31.49 = you must pay at least $86.49/hr in wages + benefits. | $55.00 | $31.49 | $86.49 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (ALAMEDA COUNTY)CARP0713-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: MILLWRIGHT (NAPA AND SONOMA COUNTIES)CARP0751-001Base $54.95 + fringe $33.08 = you must pay at least $88.03/hr in wages + benefits. | $54.95 | $33.08 | $88.03 |
CARPENTERS: JOURNEYMAN CARPENTER (NAPA AND SONOMA COUNTIES)CARP0751-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD &CARP0751-001Base $55.00 + fringe $31.49 = you must pay at least $86.49/hr in wages + benefits. | $55.00 | $31.49 | $86.49 |
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (NAPA AND SONOMA COUNTIES)CARP0751-001Base $54.85 + fringe $31.49 = you must pay at least $86.34/hr in wages + benefits. | $54.85 | $31.49 | $86.34 |
SOUND & COMMUNICATIONS: TECHNICIAN (SAN FRANCISCO COUNTY) SCOPE OF WORKELEC0006-003Base $67.65 + fringe $31.78 = you must pay at least $99.43/hr in wages + benefits. | $67.65 | $31.78 | $99.43 |
SOUND & COMMUNICATIONS: INSTALLER (SAN FRANCISCO COUNTY) SCOPE OF WORKELEC0006-003Base $58.83 + fringe $31.51 = you must pay at least $90.34/hr in wages + benefits. | $58.83 | $31.51 | $90.34 |
ELECTRICIAN (SAN FRANCISCO COUNTY) WORK ON RESIDENTIAL WOOD FRAME REMODEL ANDELEC0006-005Base $55.50 + fringe $25.64 = you must pay at least $81.14/hr in wages + benefits. | $55.50 | $25.64 | $81.14 |
ELECTRICIAN: ALL OTHER WORK (SAN FRANCISCO COUNTY:)ELEC0006-009Base $91.25 + fringe $48.05 = you must pay at least $139.30/hr in wages + benefits. | $91.25 | $48.05 | $139.30 |
ELECTRICIAN (NAPA & SOLANO COUNTIES)ELEC0180-002Base $38.50 + fringe $21.16 = you must pay at least $59.66/hr in wages + benefits. | $38.50 | $21.16 | $59.66 |
ELECTRICIAN: ZONE BELEC0234-002Base $77.45 + fringe $33.97 = you must pay at least $111.42/hr in wages + benefits. | $77.45 | $33.97 | $111.42 |
ELECTRICIAN: ZONE AELEC0234-002Base $70.41 + fringe $33.76 = you must pay at least $104.17/hr in wages + benefits. | $70.41 | $33.76 | $104.17 |
SOUND & COMMUNICATIONS: TECHNICIANELEC0234-004Base $55.12 + fringe $24.30 = you must pay at least $79.42/hr in wages + benefits. | $55.12 | $24.30 | $79.42 |
SOUND & COMMUNICATIONS: INSTALLERELEC0234-004Base $47.93 + fringe $24.09 = you must pay at least $72.02/hr in wages + benefits. | $47.93 | $24.09 | $72.02 |
ELECTRICIAN (CONTRA COSTA COUNTY)ELEC0302-002Base $66.26 + fringe $35.84 = you must pay at least $102.10/hr in wages + benefits. | $66.26 | $35.84 | $102.10 |
CABLE SPLICER (CONTRA COSTA COUNTY)ELEC0302-002Base $74.54 + fringe $36.09 = you must pay at least $110.63/hr in wages + benefits. | $74.54 | $36.09 | $110.63 |
SOUND & COMMUNICATIONS: TECHNICIAN (CONTRA COSTA COUNTY) SCOPE OF WORKELEC0302-004Base $61.04 + fringe $31.08 = you must pay at least $92.12/hr in wages + benefits. | $61.04 | $31.08 | $92.12 |
SOUND & COMMUNICATIONS: INSTALLER (CONTRA COSTA COUNTY) SCOPE OF WORKELEC0302-004Base $53.08 + fringe $30.84 = you must pay at least $83.92/hr in wages + benefits. | $53.08 | $30.84 | $83.92 |
ELECTRICIAN (SANTA CLARA COUNTY)ELEC0332-002Base $47.35 + fringe $23.49 = you must pay at least $70.84/hr in wages + benefits. | $47.35 | $23.49 | $70.84 |
SOUND & COMMUNICATIONS: TECHNICIAN (SANTA CLARA COUNTY) SCOPE OF WORKELEC0332-004Base $67.08 + fringe $31.26 = you must pay at least $98.34/hr in wages + benefits. | $67.08 | $31.26 | $98.34 |
SOUND & COMMUNICATIONS: INSTALLER (SANTA CLARA COUNTY) SCOPE OF WORK: INCLUDINGELEC0332-004Base $58.33 + fringe $31.00 = you must pay at least $89.33/hr in wages + benefits. | $58.33 | $31.00 | $89.33 |
ELECTRICIAN: WORK ON SINGLE FAMILY HOMES AND APARTMENTS UP TO AND INCLUDING 3ELEC0340-001Base $23.10 + fringe $12.48 = you must pay at least $35.58/hr in wages + benefits. | $23.10 | $12.48 | $35.58 |
ELECTRICIAN: FOUR STORIESELEC0340-001Base $39.06 + fringe $24.51 = you must pay at least $63.57/hr in wages + benefits. | $39.06 | $24.51 | $63.57 |
SOUND & COMMUNICATIONS: TECHNICIANELEC0340-004Base $46.00 + fringe $25.68 = you must pay at least $71.68/hr in wages + benefits. | $46.00 | $25.68 | $71.68 |
SOUND & COMMUNICATIONS: INSTALLERELEC0340-004Base $40.00 + fringe $25.50 = you must pay at least $65.50/hr in wages + benefits. | $40.00 | $25.50 | $65.50 |
ELECTRICIAN (EL DORADO AND PLACER COUNTIES) ZONE PAY: ZONE 1 - 0 TO 70 MILESELEC0401-006Base $31.88 + fringe $8.46 = you must pay at least $40.34/hr in wages + benefits. | $31.88 | $8.46 | $40.34 |
ELECTRICIAN (MARIN AND SONOMA COUNTIES)ELEC0551-003Base $41.00 + fringe $24.26 = you must pay at least $65.26/hr in wages + benefits. | $41.00 | $24.26 | $65.26 |
ELECTRICIAN (ALAMEDA COUNTY)ELEC0595-004Base $76.00 + fringe $49.07 = you must pay at least $125.07/hr in wages + benefits. | $76.00 | $49.07 | $125.07 |
CABLE SPLICER (ALAMEDA COUNTY)ELEC0595-004Base $87.40 + fringe $49.41 = you must pay at least $136.81/hr in wages + benefits. | $87.40 | $49.41 | $136.81 |
SOUND & COMMUNICATIONS, INSTALLER (ALAMEDA COUNTY) SCOPE OF WORK: INCLUDING ANYELEC0595-007Base $56.68 + fringe $28.35 = you must pay at least $85.03/hr in wages + benefits. | $56.68 | $28.35 | $85.03 |
ELECTRICIAN (SAN MATEO COUNTY)ELEC0617-002Base $86.00 + fringe $51.07 = you must pay at least $137.07/hr in wages + benefits. | $86.00 | $51.07 | $137.07 |
EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FORELEV0008-001Base $84.05 + fringe $38.44 = you must pay at least $122.49/hr in wages + benefits. | $84.05 | $38.44 | $122.49 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: CRANESENGI0003-009Base $63.06 + fringe $34.69 = you must pay at least $97.75/hr in wages + benefits. | $63.06 | $34.69 | $97.75 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: HYDRAULICENGI0003-009Base $44.44 + fringe $31.15 = you must pay at least $75.59/hr in wages + benefits. | $44.44 | $31.15 | $75.59 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: OILERENGI0003-009Base $42.55 + fringe $31.15 = you must pay at least $73.70/hr in wages + benefits. | $42.55 | $31.15 | $73.70 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: TRUCKENGI0003-009Base $44.83 + fringe $31.15 = you must pay at least $75.98/hr in wages + benefits. | $44.83 | $31.15 | $75.98 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: CRANESENGI0003-009Base $64.70 + fringe $34.69 = you must pay at least $99.39/hr in wages + benefits. | $64.70 | $34.69 | $99.39 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: OILERENGI0003-009Base $42.83 + fringe $31.15 = you must pay at least $73.98/hr in wages + benefits. | $42.83 | $31.15 | $73.98 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: TRUCKENGI0003-009Base $45.07 + fringe $31.15 = you must pay at least $76.22/hr in wages + benefits. | $45.07 | $31.15 | $76.22 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: CRANESENGI0003-009Base $66.39 + fringe $34.69 = you must pay at least $101.08/hr in wages + benefits. | $66.39 | $34.69 | $101.08 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: OILERENGI0003-009Base $43.79 + fringe $31.15 = you must pay at least $74.94/hr in wages + benefits. | $43.79 | $31.15 | $74.94 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: TRUCKENGI0003-009Base $46.08 + fringe $31.15 = you must pay at least $77.23/hr in wages + benefits. | $46.08 | $31.15 | $77.23 |
Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similarENGI0003-009Base $54.69 + fringe $34.69 = you must pay at least $89.38/hr in wages + benefits. | $54.69 | $34.69 | $89.38 |
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit sharpener; Boiler tender; BoxENGI0003-009Base $56.71 + fringe $34.69 = you must pay at least $91.40/hr in wages + benefits. | $56.71 | $34.69 | $91.40 |
Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotatingENGI0003-009Base $57.79 + fringe $34.69 = you must pay at least $92.48/hr in wages + benefits. | $57.79 | $34.69 | $92.48 |
Armor-Coater (or similar); Ballast jack tamper; Boom-type backfilling machineENGI0003-009Base $58.88 + fringe $34.69 = you must pay at least $93.57/hr in wages + benefits. | $58.88 | $34.69 | $93.57 |
Cast-in-place pipe laying machine; Combination slusher and motor operatorENGI0003-009Base $60.15 + fringe $34.69 = you must pay at least $94.84/hr in wages + benefits. | $60.15 | $34.69 | $94.84 |
Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loaderENGI0003-009Base $61.36 + fringe $34.69 = you must pay at least $96.05/hr in wages + benefits. | $61.36 | $34.69 | $96.05 |
Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4ENGI0003-009Base $62.69 + fringe $34.69 = you must pay at least $97.38/hr in wages + benefits. | $62.69 | $34.69 | $97.38 |
Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. ydsENGI0003-009Base $64.09 + fringe $34.69 = you must pay at least $98.78/hr in wages + benefits. | $64.09 | $34.69 | $98.78 |
Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cuENGI0003-009Base $65.54 + fringe $34.69 = you must pay at least $100.23/hr in wages + benefits. | $65.54 | $34.69 | $100.23 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 4: CRANESENGI0003-010Base $37.86 + fringe $28.03 = you must pay at least $65.89/hr in wages + benefits. | $37.86 | $28.03 | $65.89 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: TRUCKENGI0003-010Base $37.58 + fringe $28.03 = you must pay at least $65.61/hr in wages + benefits. | $37.58 | $28.03 | $65.61 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: OILERENGI0003-010Base $35.11 + fringe $28.03 = you must pay at least $63.14/hr in wages + benefits. | $35.11 | $28.03 | $63.14 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: HYDRAULICENGI0003-010Base $37.20 + fringe $28.03 = you must pay at least $65.23/hr in wages + benefits. | $37.20 | $28.03 | $65.23 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: CRANESENGI0003-010Base $63.06 + fringe $34.69 = you must pay at least $97.75/hr in wages + benefits. | $63.06 | $34.69 | $97.75 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: TRUCKENGI0003-010Base $37.83 + fringe $28.03 = you must pay at least $65.86/hr in wages + benefits. | $37.83 | $28.03 | $65.86 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: OILERENGI0003-010Base $35.34 + fringe $28.03 = you must pay at least $63.37/hr in wages + benefits. | $35.34 | $28.03 | $63.37 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: CRANESENGI0003-010Base $64.70 + fringe $34.69 = you must pay at least $99.39/hr in wages + benefits. | $64.70 | $34.69 | $99.39 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: CRANESENGI0003-010Base $66.39 + fringe $34.69 = you must pay at least $101.08/hr in wages + benefits. | $66.39 | $34.69 | $101.08 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: OILERENGI0003-010Base $35.59 + fringe $28.03 = you must pay at least $63.62/hr in wages + benefits. | $35.59 | $28.03 | $63.62 |
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: TRUCKENGI0003-010Base $38.05 + fringe $28.03 = you must pay at least $66.08/hr in wages + benefits. | $38.05 | $28.03 | $66.08 |
Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similarENGI0003-010Base $54.69 + fringe $34.69 = you must pay at least $89.38/hr in wages + benefits. | $54.69 | $34.69 | $89.38 |
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit sharpener; Boiler tender; BoxENGI0003-010Base $56.71 + fringe $34.69 = you must pay at least $91.40/hr in wages + benefits. | $56.71 | $34.69 | $91.40 |
Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotatingENGI0003-010Base $57.79 + fringe $34.69 = you must pay at least $92.48/hr in wages + benefits. | $57.79 | $34.69 | $92.48 |
Armor-Coater (or similar); Ballast jack tamper; Boom- type backfilling machineENGI0003-010Base $58.88 + fringe $34.69 = you must pay at least $93.57/hr in wages + benefits. | $58.88 | $34.69 | $93.57 |
Cast-in-place pipe laying machine; Combination slusher and motor operatorENGI0003-010Base $60.15 + fringe $34.69 = you must pay at least $94.84/hr in wages + benefits. | $60.15 | $34.69 | $94.84 |
Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loaderENGI0003-010Base $61.36 + fringe $34.69 = you must pay at least $96.05/hr in wages + benefits. | $61.36 | $34.69 | $96.05 |
Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4ENGI0003-010Base $62.69 + fringe $34.69 = you must pay at least $97.38/hr in wages + benefits. | $62.69 | $34.69 | $97.38 |
Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. ydsENGI0003-010Base $64.09 + fringe $34.69 = you must pay at least $98.78/hr in wages + benefits. | $64.09 | $34.69 | $98.78 |
Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cuENGI0003-010Base $65.54 + fringe $34.69 = you must pay at least $100.23/hr in wages + benefits. | $65.54 | $34.69 | $100.23 |
GROUP 3 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 ASENGI0003-011Base $49.64 + fringe $28.56 = you must pay at least $78.20/hr in wages + benefits. | $49.64 | $28.56 | $78.20 |
GROUP 3 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SANENGI0003-011Base $47.64 + fringe $28.56 = you must pay at least $76.20/hr in wages + benefits. | $47.64 | $28.56 | $76.20 |
GROUP 2 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 ASENGI0003-011Base $54.25 + fringe $28.56 = you must pay at least $82.81/hr in wages + benefits. | $54.25 | $28.56 | $82.81 |
GROUP 2 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SANENGI0003-011Base $52.25 + fringe $28.56 = you must pay at least $80.81/hr in wages + benefits. | $52.25 | $28.56 | $80.81 |
GROUP 1 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 ASENGI0003-011Base $57.85 + fringe $28.56 = you must pay at least $86.41/hr in wages + benefits. | $57.85 | $28.56 | $86.41 |
GROUP 1 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SANENGI0003-011Base $55.85 + fringe $28.56 = you must pay at least $84.41/hr in wages + benefits. | $55.85 | $28.56 | $84.41 |
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURALIRON0377-001Base $55.33 + fringe $35.15 = you must pay at least $90.48/hr in wages + benefits. | $55.33 | $35.15 | $90.48 |
IRONWORKERS: FENCE ERECTORIRON0377-001Base $45.78 + fringe $26.51 = you must pay at least $72.29/hr in wages + benefits. | $45.78 | $26.51 | $72.29 |
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (SAN FRANCISCO CITY ANDIRON0377-003Base $55.83 + fringe $35.15 = you must pay at least $90.98/hr in wages + benefits. | $55.83 | $35.15 | $90.98 |
IRONWORKERS: FENCE ERECTOR (SAN FRANCISCO CITY AND COUNTY) PREMIUM $6.00IRON0377-003Base $45.78 + fringe $26.51 = you must pay at least $72.29/hr in wages + benefits. | $45.78 | $26.51 | $72.29 |
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL (REMAINING COUNTIES) PREMIUMIRON0433-005Base $50.70 + fringe $35.15 = you must pay at least $85.85/hr in wages + benefits. | $50.70 | $35.15 | $85.85 |
IRONWORKER: FENCE ERECTOR (REMAINING COUNTIES) PREMIUM $6.00 additional perIRON0433-005Base $45.78 + fringe $26.51 = you must pay at least $72.29/hr in wages + benefits. | $45.78 | $26.51 | $72.29 |
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2LABO0067-007Base $38.15 + fringe $30.03 = you must pay at least $68.18/hr in wages + benefits. | $38.15 | $30.03 | $68.18 |
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1LABO0067-007Base $39.15 + fringe $30.03 = you must pay at least $69.18/hr in wages + benefits. | $39.15 | $30.03 | $69.18 |
LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENTLABO0185-001Base $28.94 + fringe $27.30 = you must pay at least $56.24/hr in wages + benefits. | $28.94 | $27.30 | $56.24 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEWLABO0185-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
LABORERS:, WRECKING: GROUP 2 Semi-skilled wrecker (salvaging of other buildingLABO0185-001Base $35.35 + fringe $27.30 = you must pay at least $62.65/hr in wages + benefits. | $35.35 | $27.30 | $62.65 |
LABORERS:, WRECKING: GROUP 1 Skilled wreckerLABO0185-001Base $35.50 + fringe $27.30 = you must pay at least $62.80/hr in wages + benefits. | $35.50 | $27.30 | $62.80 |
LABORERS:, GUNITE: GROUP 4 GUNITE LABORERLABO0185-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
LABORERS:, GUNITE: GROUP 3 REBOUNDMANLABO0185-001Base $35.37 + fringe $27.30 = you must pay at least $62.67/hr in wages + benefits. | $35.37 | $27.30 | $62.67 |
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMANLABO0185-001Base $35.96 + fringe $27.30 = you must pay at least $63.26/hr in wages + benefits. | $35.96 | $27.30 | $63.26 |
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMANLABO0185-001Base $36.46 + fringe $27.30 = you must pay at least $63.76/hr in wages + benefits. | $36.46 | $27.30 | $63.76 |
ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TOLABO0185-001Base $28.94 + fringe $27.30 = you must pay at least $56.24/hr in wages + benefits. | $28.94 | $27.30 | $56.24 |
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTERLABO0185-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTERLABO0185-001Base $35.35 + fringe $27.30 = you must pay at least $62.65/hr in wages + benefits. | $35.35 | $27.30 | $62.65 |
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND INLABO0185-001Base $36.05 + fringe $27.30 = you must pay at least $63.35/hr in wages + benefits. | $36.05 | $27.30 | $63.35 |
BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICSLABO0185-001Base $35.55 + fringe $27.30 = you must pay at least $62.85/hr in wages + benefits. | $35.55 | $27.30 | $62.85 |
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLSLABO0185-001Base $35.72 + fringe $27.30 = you must pay at least $63.02/hr in wages + benefits. | $35.72 | $27.30 | $63.02 |
Asphalt spreader boxes (all types); Barko, Wacker and similar type tampersLABO0185-001Base $35.50 + fringe $27.30 = you must pay at least $62.80/hr in wages + benefits. | $35.50 | $27.30 | $62.80 |
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST: ASPHALT IRONERLABO0185-001Base $36.20 + fringe $27.30 = you must pay at least $63.50/hr in wages + benefits. | $36.20 | $27.30 | $63.50 |
LABORER: MASON TENDER-BRICKLABO0185-003Base $36.29 + fringe $25.55 = you must pay at least $61.84/hr in wages + benefits. | $36.29 | $25.55 | $61.84 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEWLABO0261-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENTLABO0261-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
LABORERS:, WRECKING: GROUP 2 SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDINGLABO0261-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
LABORERS:, WRECKING: GROUP 1 SKILLED WRECKERLABO0261-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
LABORERS:, GUNITE: GROUP 4 GUNITE LABORERLABO0261-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LABORERS:, GUNITE: GROUP 3 REBOUNDMANLABO0261-001Base $36.37 + fringe $27.30 = you must pay at least $63.67/hr in wages + benefits. | $36.37 | $27.30 | $63.67 |
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMANLABO0261-001Base $36.96 + fringe $27.30 = you must pay at least $64.26/hr in wages + benefits. | $36.96 | $27.30 | $64.26 |
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMANLABO0261-001Base $37.46 + fringe $27.30 = you must pay at least $64.76/hr in wages + benefits. | $37.46 | $27.30 | $64.76 |
ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TOLABO0261-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTERLABO0261-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTERLABO0261-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND INLABO0261-001Base $37.05 + fringe $27.30 = you must pay at least $64.35/hr in wages + benefits. | $37.05 | $27.30 | $64.35 |
BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICSLABO0261-001Base $36.55 + fringe $27.30 = you must pay at least $63.85/hr in wages + benefits. | $36.55 | $27.30 | $63.85 |
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLSLABO0261-001Base $36.72 + fringe $27.30 = you must pay at least $64.02/hr in wages + benefits. | $36.72 | $27.30 | $64.02 |
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERSLABO0261-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST: ASPHALT IRONERLABO0261-001Base $37.20 + fringe $27.30 = you must pay at least $64.50/hr in wages + benefits. | $37.20 | $27.30 | $64.50 |
LABORER: MASON TENDER-BRICK MARIN COUNTYLABO0261-008Base $37.54 + fringe $25.55 = you must pay at least $63.09/hr in wages + benefits. | $37.54 | $25.55 | $63.09 |
MASON TENDER, BRICK SAN FRANCISCO AND SAN MATEO COUNTIES FOOTNOTES: UNDERGROUNDLABO0261-011Base $37.05 + fringe $27.45 = you must pay at least $64.50/hr in wages + benefits. | $37.05 | $27.45 | $64.50 |
PLASTERER TENDERLABO0261-012Base $39.77 + fringe $28.54 = you must pay at least $68.31/hr in wages + benefits. | $39.77 | $28.54 | $68.31 |
PLASTER TENDER (SAN FRANCISCO AND SAN MATEO COUNTIES) WORK ON A SWING STAGELABO0261-013Base $41.93 + fringe $30.32 = you must pay at least $72.25/hr in wages + benefits. | $41.93 | $30.32 | $72.25 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: NEWLABO0270-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA BLABO0270-001Base $28.94 + fringe $27.30 = you must pay at least $56.24/hr in wages + benefits. | $28.94 | $27.30 | $56.24 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: NEWLABO0270-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA ALABO0270-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
Semi-skilled wrecker (salvaging of other building materials)LABO0270-001Base $35.35 + fringe $27.30 = you must pay at least $62.65/hr in wages + benefits. | $35.35 | $27.30 | $62.65 |
LABORERS:, WRECKING - AREA B: GROUP 1: Skilled wreckerLABO0270-001Base $35.50 + fringe $27.30 = you must pay at least $62.80/hr in wages + benefits. | $35.50 | $27.30 | $62.80 |
LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled wrecker (salvaging of otherLABO0270-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
LABORERS:, WRECKING - AREA A: GROUP 1: Skilled wreckerLABO0270-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
LABORERS:, GUNITE - AREA B: GROUP 4: GUNITE LABORERLABO0270-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
LABORERS:, GUNITE - AREA B: GROUP 3: REBOUNDMANLABO0270-001Base $35.37 + fringe $27.30 = you must pay at least $62.67/hr in wages + benefits. | $35.37 | $27.30 | $62.67 |
LABORERS:, GUNITE - AREA B: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GORUNDMANLABO0270-001Base $35.96 + fringe $27.30 = you must pay at least $63.26/hr in wages + benefits. | $35.96 | $27.30 | $63.26 |
LABORERS:, GUNITE - AREA B: GROUP 1: STRUCTURAL NOZZLEMANLABO0270-001Base $36.46 + fringe $27.30 = you must pay at least $63.76/hr in wages + benefits. | $36.46 | $27.30 | $63.76 |
LABORERS:, GUNITE - AREA A: GROUP 4: GUNITE LABORER (AREA ""A"" - SANTA CLARALABO0270-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LABORERS:, GUNITE - AREA A: GROUP 3: REBOUNDMAN (AREA ""A"" - SANTA CLARALABO0270-001Base $36.37 + fringe $27.30 = you must pay at least $63.67/hr in wages + benefits. | $36.37 | $27.30 | $63.67 |
LABORERS:, GUNITE - AREA A: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (AREALABO0270-001Base $36.96 + fringe $27.30 = you must pay at least $64.26/hr in wages + benefits. | $36.96 | $27.30 | $64.26 |
LABORERS:, GUNITE - AREA A: GROUP 1: STRUCTURAL NOZZLEMAN (AREA ""A"" - SANTALABO0270-001Base $37.46 + fringe $27.30 = you must pay at least $64.76/hr in wages + benefits. | $37.46 | $27.30 | $64.76 |
GROUP 4: All clean-up work of debris, grounds and building including but notLABO0270-001Base $28.94 + fringe $27.30 = you must pay at least $56.24/hr in wages + benefits. | $28.94 | $27.30 | $56.24 |
GROUP 3: Construction laborers, including bridge and general laborer; DumpLABO0270-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsumLABO0270-001Base $35.35 + fringe $27.30 = you must pay at least $62.65/hr in wages + benefits. | $35.35 | $27.30 | $62.65 |
GROUP 1-F: Wire winding machine in connection with guniting or shot creteLABO0270-001Base $36.08 + fringe $27.30 = you must pay at least $63.38/hr in wages + benefits. | $36.08 | $27.30 | $63.38 |
GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work onLABO0270-001Base $36.05 + fringe $27.30 = you must pay at least $63.35/hr in wages + benefits. | $36.05 | $27.30 | $63.35 |
GROUP 1-C: Burning and welding in connection with laborers' work; SyntheticLABO0270-001Base $35.55 + fringe $27.30 = you must pay at least $62.85/hr in wages + benefits. | $35.55 | $27.30 | $62.85 |
GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar typeLABO0270-001Base $35.72 + fringe $27.30 = you must pay at least $63.02/hr in wages + benefits. | $35.72 | $27.30 | $63.02 |
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar typeLABO0270-001Base $35.50 + fringe $27.30 = you must pay at least $62.80/hr in wages + benefits. | $35.50 | $27.30 | $62.80 |
CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam inLABO0270-001Base $36.20 + fringe $27.30 = you must pay at least $63.50/hr in wages + benefits. | $36.20 | $27.30 | $63.50 |
GROUP 4: All clean-up work of debris, grounds and building including but notLABO0270-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
GROUP 3: Construction laborers, including bridge and general laborer; DumpLABO0270-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsumLABO0270-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
GROUP 1-F: Wire winding machine in connection with guniting or shot creteLABO0270-001Base $37.08 + fringe $27.30 = you must pay at least $64.38/hr in wages + benefits. | $37.08 | $27.30 | $64.38 |
GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work onLABO0270-001Base $37.05 + fringe $27.30 = you must pay at least $64.35/hr in wages + benefits. | $37.05 | $27.30 | $64.35 |
GROUP 1-C: Burning and welding in connection with laborers' work; SyntheticLABO0270-001Base $36.55 + fringe $27.30 = you must pay at least $63.85/hr in wages + benefits. | $36.55 | $27.30 | $63.85 |
GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar typeLABO0270-001Base $36.72 + fringe $27.30 = you must pay at least $64.02/hr in wages + benefits. | $36.72 | $27.30 | $64.02 |
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar typeLABO0270-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam inLABO0270-001Base $37.20 + fringe $27.30 = you must pay at least $64.50/hr in wages + benefits. | $37.20 | $27.30 | $64.50 |
MASON TENDER, BRICK (SANTA CRUZ COUNTY)LABO0270-002Base $35.29 + fringe $26.85 = you must pay at least $62.14/hr in wages + benefits. | $35.29 | $26.85 | $62.14 |
MASON TENDER, BRICK (SANTA CLARA COUNTY)LABO0270-002Base $35.29 + fringe $26.85 = you must pay at least $62.14/hr in wages + benefits. | $35.29 | $26.85 | $62.14 |
LABORER: MASON TENDER-BRICK (MONTEREY AND SAN BENITO COUNTIES)LABO0270-006Base $36.29 + fringe $25.55 = you must pay at least $61.84/hr in wages + benefits. | $36.29 | $25.55 | $61.84 |
PLASTER TENDER (SANTA CLARA & SANTA CRUZ) WORK ON A SWING STAGE SCAFFOLD: $1.00LABO0270-008Base $40.68 + fringe $29.68 = you must pay at least $70.36/hr in wages + benefits. | $40.68 | $29.68 | $70.36 |
PLASTERER TENDER (MONTEREY AND SAN BENITO COUNTIES) WORK ON A SWING STAGELABO0270-009Base $40.68 + fringe $29.68 = you must pay at least $70.36/hr in wages + benefits. | $40.68 | $29.68 | $70.36 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEWLABO0304-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENTLABO0304-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
LABORERS:, WRECKING: GROUP 2 GROUP 2: Semi-skilled wrecker (salvaging of otherLABO0304-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
LABORERS:, WRECKING: GROUP 1 Skilled wreckerLABO0304-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER (ALAMEDA COUNTY)LABO0304-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN (ALAMEDA COUNTY)LABO0304-001Base $36.37 + fringe $27.30 = you must pay at least $63.67/hr in wages + benefits. | $36.37 | $27.30 | $63.67 |
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (ALAMEDA COUNTY)LABO0304-001Base $36.96 + fringe $27.30 = you must pay at least $64.26/hr in wages + benefits. | $36.96 | $27.30 | $64.26 |
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN (ALAMEDA COUNTY)LABO0304-001Base $37.46 + fringe $27.30 = you must pay at least $64.76/hr in wages + benefits. | $37.46 | $27.30 | $64.76 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4 ALL CLEAN-UP WORK OF DEBRISLABO0304-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3 CONSTRUCTION LABORERSLABO0304-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPERLABO0304-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-F WIRE WINDING MACHINE INLABO0304-001Base $37.08 + fringe $27.30 = you must pay at least $64.38/hr in wages + benefits. | $37.08 | $27.30 | $64.38 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E WORK ON AND/OR IN BELL HOLELABO0304-001Base $37.05 + fringe $27.30 = you must pay at least $64.35/hr in wages + benefits. | $37.05 | $27.30 | $64.35 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C BURNING AND WELDING INLABO0304-001Base $36.55 + fringe $27.30 = you must pay at least $63.85/hr in wages + benefits. | $36.55 | $27.30 | $63.85 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A JOY DRILL MODEL TWM-2ALABO0304-001Base $36.72 + fringe $27.30 = you must pay at least $64.02/hr in wages + benefits. | $36.72 | $27.30 | $64.02 |
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1 ASPHALT SPREADER BOXES (ALLLABO0304-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST ASPHALT IRONERLABO0304-001Base $37.20 + fringe $27.30 = you must pay at least $64.50/hr in wages + benefits. | $37.20 | $27.30 | $64.50 |
BRICK TENDER (ALAMEDA COUNTY) FOOTNOTES: WORK ON JOBS WHERE HEAT-PROTECTIVELABO0304-006Base $37.05 + fringe $27.45 = you must pay at least $64.50/hr in wages + benefits. | $37.05 | $27.45 | $64.50 |
PLASTERER TENDER (ALAMEDA AND CONTRA COSTA COUNTIES) WORK ON A SWING STAGELABO0304-007Base $41.93 + fringe $30.32 = you must pay at least $72.25/hr in wages + benefits. | $41.93 | $30.32 | $72.25 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: NEWLABO0324-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA BLABO0324-001Base $28.94 + fringe $27.30 = you must pay at least $56.24/hr in wages + benefits. | $28.94 | $27.30 | $56.24 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: NEWLABO0324-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA ALABO0324-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
LABORERS:, WRECKING - AREA B: GROUP 2: Semi-skilled wrecker (salvaging of otherLABO0324-001Base $35.35 + fringe $27.30 = you must pay at least $62.65/hr in wages + benefits. | $35.35 | $27.30 | $62.65 |
LABORERS:, WRECKING - AREA B: GROUP 1: Skilled wreckerLABO0324-001Base $35.50 + fringe $27.30 = you must pay at least $62.80/hr in wages + benefits. | $35.50 | $27.30 | $62.80 |
LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled wrecker (salvaging of otherLABO0324-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
LABORERS:, WRECKING - AREA A: GROUP 1: Skilled wreckerLABO0324-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
LABORERS:, GUNITE - AREA B: GROUP 4: Gunite laborerLABO0324-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
LABORERS:, GUNITE - AREA B: GROUP 3: ReboundmanLABO0324-001Base $35.37 + fringe $27.30 = you must pay at least $62.67/hr in wages + benefits. | $35.37 | $27.30 | $62.67 |
LABORERS:, GUNITE - AREA B: GROUP 2: Nozzleman, Gunman, Potman, GroundmanLABO0324-001Base $35.96 + fringe $27.30 = you must pay at least $63.26/hr in wages + benefits. | $35.96 | $27.30 | $63.26 |
LABORERS:, GUNITE - AREA B: GROUP 1: Structural nozzleman (AREA ""A"" - CONTRALABO0324-001Base $36.46 + fringe $27.30 = you must pay at least $63.76/hr in wages + benefits. | $36.46 | $27.30 | $63.76 |
LABORERS:, GUNITE - AREA A: GROUP 4: Gunite laborer (AREA ""A"" - CONTRA COSTALABO0324-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
LABORERS:, GUNITE - AREA A: GROUP 3: Reboundman (AREA ""A"" - CONTRA COSTALABO0324-001Base $36.37 + fringe $27.30 = you must pay at least $63.67/hr in wages + benefits. | $36.37 | $27.30 | $63.67 |
LABORERS:, GUNITE - AREA A: GROUP 2: Nozzleman, Gunman, Potman, Groundman (AREALABO0324-001Base $36.96 + fringe $27.30 = you must pay at least $64.26/hr in wages + benefits. | $36.96 | $27.30 | $64.26 |
LABORERS:, GUNITE - AREA A: GROUP 1: Structural nozzleman (AREA ""A"" - CONTRALABO0324-001Base $37.46 + fringe $27.30 = you must pay at least $64.76/hr in wages + benefits. | $37.46 | $27.30 | $64.76 |
GROUP 4: All clean-up work of debris, grounds and building including but notLABO0324-001Base $28.94 + fringe $27.30 = you must pay at least $56.24/hr in wages + benefits. | $28.94 | $27.30 | $56.24 |
GROUP 3: Construction laborers, including bridge and general laborer; DumpLABO0324-001Base $35.25 + fringe $27.30 = you must pay at least $62.55/hr in wages + benefits. | $35.25 | $27.30 | $62.55 |
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsumLABO0324-001Base $35.35 + fringe $27.30 = you must pay at least $62.65/hr in wages + benefits. | $35.35 | $27.30 | $62.65 |
GROUP 1-F: Wire winding machine in connection with guniting or shot creteLABO0324-001Base $36.08 + fringe $27.30 = you must pay at least $63.38/hr in wages + benefits. | $36.08 | $27.30 | $63.38 |
GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work onLABO0324-001Base $36.05 + fringe $27.30 = you must pay at least $63.35/hr in wages + benefits. | $36.05 | $27.30 | $63.35 |
GROUP 1-C: Burning and welding in connection with laborers' work; SyntheticLABO0324-001Base $35.55 + fringe $27.30 = you must pay at least $62.85/hr in wages + benefits. | $35.55 | $27.30 | $62.85 |
GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar typeLABO0324-001Base $35.72 + fringe $27.30 = you must pay at least $63.02/hr in wages + benefits. | $35.72 | $27.30 | $63.02 |
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar typeLABO0324-001Base $35.50 + fringe $27.30 = you must pay at least $62.80/hr in wages + benefits. | $35.50 | $27.30 | $62.80 |
CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam inLABO0324-001Base $36.20 + fringe $27.30 = you must pay at least $63.50/hr in wages + benefits. | $36.20 | $27.30 | $63.50 |
GROUP 4: All clean-up work of debris, grounds and building including but notLABO0324-001Base $29.94 + fringe $27.30 = you must pay at least $57.24/hr in wages + benefits. | $29.94 | $27.30 | $57.24 |
GROUP 3: Construction laborers, including bridge and general laborer; DumpLABO0324-001Base $36.25 + fringe $27.30 = you must pay at least $63.55/hr in wages + benefits. | $36.25 | $27.30 | $63.55 |
GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUMLABO0324-001Base $36.35 + fringe $27.30 = you must pay at least $63.65/hr in wages + benefits. | $36.35 | $27.30 | $63.65 |
GROUP 1-G CONTRA COSTA COUNTY: PipelayerLABO0324-001Base $36.70 + fringe $27.30 = you must pay at least $64.00/hr in wages + benefits. | $36.70 | $27.30 | $64.00 |
GROUP 1-F: Wire winding machine in connection with guniting or shot crete (AREALABO0324-001Base $37.08 + fringe $27.30 = you must pay at least $64.38/hr in wages + benefits. | $37.08 | $27.30 | $64.38 |
GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ONLABO0324-001Base $37.05 + fringe $27.30 = you must pay at least $64.35/hr in wages + benefits. | $37.05 | $27.30 | $64.35 |
GROUP 1-CLABO0324-001Base $36.55 + fringe $27.30 = you must pay at least $63.85/hr in wages + benefits. | $36.55 | $27.30 | $63.85 |
GROUP 1-A OY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPELABO0324-001Base $36.72 + fringe $27.30 = you must pay at least $64.02/hr in wages + benefits. | $36.72 | $27.30 | $64.02 |
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar typeLABO0324-001Base $36.50 + fringe $27.30 = you must pay at least $63.80/hr in wages + benefits. | $36.50 | $27.30 | $63.80 |
CONSTRUCTION SPECIALIST Asphalt ironer and raker; Chainsaw; Laser beam inLABO0324-001Base $37.20 + fringe $27.30 = you must pay at least $64.50/hr in wages + benefits. | $37.20 | $27.30 | $64.50 |
LABORER: MASON TENDER-BRICK (SOLANO AND SONOMA COUNTIES)LABO0324-011Base $36.84 + fringe $26.24 = you must pay at least $63.08/hr in wages + benefits. | $36.84 | $26.24 | $63.08 |
WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOURLABO0324-015Base $37.05 + fringe $27.45 = you must pay at least $64.50/hr in wages + benefits. | $37.05 | $27.45 | $64.50 |
PLASTER TENDERLABO0324-017Base $39.77 + fringe $28.54 = you must pay at least $68.31/hr in wages + benefits. | $39.77 | $28.54 | $68.31 |
PAINTERS: BRUSHPAIN0016-002Base $43.45 + fringe $22.80 = you must pay at least $66.25/hr in wages + benefits. | $43.45 | $22.80 | $66.25 |
SOFT FLOOR LAYERPAIN0016-009Base $59.00 + fringe $33.03 = you must pay at least $92.03/hr in wages + benefits. | $59.00 | $33.03 | $92.03 |
DRYWALL FINISHER/TAPER: (AREA 2) AREA 2: EL DORADO COUNTY, MONTEREY, PLACERPAIN0016-011Base $59.63 + fringe $31.29 = you must pay at least $90.92/hr in wages + benefits. | $59.63 | $31.29 | $90.92 |
DRYWALL FINISHER/TAPER: (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, NAPA, SANPAIN0016-011Base $63.76 + fringe $32.69 = you must pay at least $96.45/hr in wages + benefits. | $63.76 | $32.69 | $96.45 |
PAINTERPAIN0016-013Base $53.38 + fringe $28.04 = you must pay at least $81.42/hr in wages + benefits. | $53.38 | $28.04 | $81.42 |
PAINTER (SAN FRANCISCO COUNTY)PAIN0016-019Base $57.00 + fringe $28.04 = you must pay at least $85.04/hr in wages + benefits. | $57.00 | $28.04 | $85.04 |
GLAZIERPAIN0169-006Base $56.22 + fringe $34.00 = you must pay at least $90.22/hr in wages + benefits. | $56.22 | $34.00 | $90.22 |
PAINTER: SPRAY PAINTER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY &PAIN0567-002Base $41.43 + fringe $16.16 = you must pay at least $57.59/hr in wages + benefits. | $41.43 | $16.16 | $57.59 |
PAINTER: PAPER HANGER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY &PAIN0567-002Base $42.19 + fringe $16.16 = you must pay at least $58.35/hr in wages + benefits. | $42.19 | $16.16 | $58.35 |
PAINTER: BRUSH AND ROLLER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY &PAIN0567-002Base $39.43 + fringe $16.16 = you must pay at least $55.59/hr in wages + benefits. | $39.43 | $16.16 | $55.59 |
SOFT FLOOR LAYER (EL DORADO AND PLACER COUNTIES)PAIN0567-008Base $34.27 + fringe $16.47 = you must pay at least $50.74/hr in wages + benefits. | $34.27 | $16.47 | $50.74 |
DRYWALL FINISHER/TAPER (EL DORADO AND PLACER COUNTIES) STEEPLEJACK-DRYWALLPAIN0567-011Base $42.79 + fringe $16.12 = you must pay at least $58.91/hr in wages + benefits. | $42.79 | $16.12 | $58.91 |
GLAZIERPAIN0767-002Base $43.25 + fringe $35.62 = you must pay at least $78.87/hr in wages + benefits. | $43.25 | $35.62 | $78.87 |
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVEPAIN1176-001Base $35.11 + fringe $17.62 = you must pay at least $52.73/hr in wages + benefits. | $35.11 | $17.62 | $52.73 |
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPERPAIN1176-001Base $40.83 + fringe $17.62 = you must pay at least $58.45/hr in wages + benefits. | $40.83 | $17.62 | $58.45 |
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT &PAIN1176-001Base $34.71 + fringe $17.62 = you must pay at least $52.33/hr in wages + benefits. | $34.71 | $17.62 | $52.33 |
SOFT FLOOR LAYERPAIN1237-002Base $48.54 + fringe $26.59 = you must pay at least $75.13/hr in wages + benefits. | $48.54 | $26.59 | $75.13 |
PLASTERERPLAS0066-001Base $42.41 + fringe $30.73 = you must pay at least $73.14/hr in wages + benefits. | $42.41 | $30.73 | $73.14 |
PLASTERER (AREA 355: MARIN COUNTY)PLAS0300-002Base $36.73 + fringe $31.68 = you must pay at least $68.41/hr in wages + benefits. | $36.73 | $31.68 | $68.41 |
PLASTERER (AREA 337: MONTEREY COUNTY)PLAS0300-002Base $32.88 + fringe $31.68 = you must pay at least $64.56/hr in wages + benefits. | $32.88 | $31.68 | $64.56 |
PLASTERERPLAS0300-002Base $32.70 + fringe $31.68 = you must pay at least $64.38/hr in wages + benefits. | $32.70 | $31.68 | $64.38 |
PLASTERERPLAS0300-002Base $32.88 + fringe $31.68 = you must pay at least $64.56/hr in wages + benefits. | $32.88 | $31.68 | $64.56 |
CEMENT MASON/CONCRETE FINISHERPLAS0300-005Base $32.15 + fringe $23.27 = you must pay at least $55.42/hr in wages + benefits. | $32.15 | $23.27 | $55.42 |
PLUMBER, STEAMFITTER, REFRIGERATION FITTER: (2) NEW CONSTRUCTION IN SANPLUM0038-003Base $91.00 + fringe $49.49 = you must pay at least $140.49/hr in wages + benefits. | $91.00 | $49.49 | $140.49 |
PLUMBER, STEAMFITTER, REFRIGERATION FITTER: (1) Wood Frame Construction in SanPLUM0038-003Base $82.00 + fringe $48.18 = you must pay at least $130.18/hr in wages + benefits. | $82.00 | $48.18 | $130.18 |
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER (MARIN, SAN FRANCISCO &PLUM0038-007Base $77.35 + fringe $36.53 = you must pay at least $113.88/hr in wages + benefits. | $77.35 | $36.53 | $113.88 |
PLUMBER & STEAMFITTER (MONTEREY AND SANTA CRUZ COUNTIES)PLUM0062-001Base $57.75 + fringe $43.60 = you must pay at least $101.35/hr in wages + benefits. | $57.75 | $43.60 | $101.35 |
PLUMBER, PIPEFITTER, STEAMFITTER (CONTRA COSTA COUNTY)PLUM0159-002Base $43.72 + fringe $20.29 = you must pay at least $64.01/hr in wages + benefits. | $43.72 | $20.29 | $64.01 |
PLUMBER (SUTTER & YUBA COUNTIES)PLUM0228-002Base $52.75 + fringe $41.39 = you must pay at least $94.14/hr in wages + benefits. | $52.75 | $41.39 | $94.14 |
PLUMBER & STEAMFITTER (ALAMEDA COUNTY)PLUM0342-002Base $80.50 + fringe $50.45 = you must pay at least $130.95/hr in wages + benefits. | $80.50 | $50.45 | $130.95 |
PLUMBERS AND PIPEFITTERS (NAPA AND SOLANO COUNTIES) FOOTNOTES: WORK FROMPLUM0343-002Base $37.35 + fringe $21.15 = you must pay at least $58.50/hr in wages + benefits. | $37.35 | $21.15 | $58.50 |
PLUMBERS AND PIPEFITTERSPLUM0350-002Base $52.14 + fringe $18.71 = you must pay at least $70.85/hr in wages + benefits. | $52.14 | $18.71 | $70.85 |
UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTERPLUM0355-002Base $36.01 + fringe $18.50 = you must pay at least $54.51/hr in wages + benefits. | $36.01 | $18.50 | $54.51 |
PLUMBERS AND PIPEFITTERS (SAN BENITO & SANTA CLARA COUNTIES)PLUM0393-002Base $30.90 + fringe $7.90 = you must pay at least $38.80/hr in wages + benefits. | $30.90 | $7.90 | $38.80 |
PLUMBERS AND PIPEFITTERSPLUM0447-003Base $55.58 + fringe $24.02 = you must pay at least $79.60/hr in wages + benefits. | $55.58 | $24.02 | $79.60 |
PLUMBER/PIPEFITTER/STEAMFITTER (SAN MATEO COUNTY)PLUM0467-001Base $87.75 + fringe $41.44 = you must pay at least $129.19/hr in wages + benefits. | $87.75 | $41.44 | $129.19 |
ROOFER (SAN FRANCISCO & SAN MATEO COUNTIES)ROOF0040-001Base $55.30 + fringe $22.97 = you must pay at least $78.27/hr in wages + benefits. | $55.30 | $22.97 | $78.27 |
ROOFERROOF0081-003Base $54.94 + fringe $23.34 = you must pay at least $78.28/hr in wages + benefits. | $54.94 | $23.34 | $78.28 |
ROOFERROOF0081-005Base $46.73 + fringe $21.36 = you must pay at least $68.09/hr in wages + benefits. | $46.73 | $21.36 | $68.09 |
ROOFER: KETTLE PERSON (2 KETTLES)ROOF0095-001Base $55.17 + fringe $21.51 = you must pay at least $76.68/hr in wages + benefits. | $55.17 | $21.51 | $76.68 |
ROOFER: JOURNEYMANROOF0095-001Base $53.17 + fringe $21.51 = you must pay at least $74.68/hr in wages + benefits. | $53.17 | $21.51 | $74.68 |
ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKERROOF0095-001Base $57.17 + fringe $21.51 = you must pay at least $78.68/hr in wages + benefits. | $57.17 | $21.51 | $78.68 |
SPRINKLER FITTERSFCA0483-002Base $49.82 + fringe $18.05 = you must pay at least $67.87/hr in wages + benefits. | $49.82 | $18.05 | $67.87 |
SPRINKLER FITTERSFCA0669-006Base $49.69 + fringe $29.72 = you must pay at least $79.41/hr in wages + benefits. | $49.69 | $29.72 | $79.41 |
SPRINKLER FITTERSFCA0669-012Base $52.06 + fringe $29.86 = you must pay at least $81.92/hr in wages + benefits. | $52.06 | $29.86 | $81.92 |
SHEET METAL WORKER: (AREA 2) AREA 2: MONTEREY & SAN BENITOSHEE0104-002Base $60.64 + fringe $39.04 = you must pay at least $99.68/hr in wages + benefits. | $60.64 | $39.04 | $99.68 |
SHEET METAL WORKER: (AREA 3) AREA 3: SANTA CRUZSHEE0104-002Base $55.16 + fringe $34.18 = you must pay at least $89.34/hr in wages + benefits. | $55.16 | $34.18 | $89.34 |
SHEET METAL WORKER: (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SANSHEE0104-002Base $67.03 + fringe $50.79 = you must pay at least $117.82/hr in wages + benefits. | $67.03 | $50.79 | $117.82 |
SHEET METAL WORKERSHEE0104-017Base $30.29 + fringe $16.41 = you must pay at least $46.70/hr in wages + benefits. | $30.29 | $16.41 | $46.70 |
TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND OVER; HOLLAND HAULER; LOW BEDTEAM0094-001Base $44.56 + fringe $34.28 = you must pay at least $78.84/hr in wages + benefits. | $44.56 | $34.28 | $78.84 |
TRUCK DRIVERS: GROUP 4: DUMP TRUCKS, OVER 25 YDS. AND UNDER 65 YDS.; WATERTEAM0094-001Base $44.21 + fringe $34.28 = you must pay at least $78.49/hr in wages + benefits. | $44.21 | $34.28 | $78.49 |
TRUCK DRIVERS: GROUP 3: DUMP TRUCKS, 8 YDS. AND INCLUDING 24 YDS.; TRANSITTEAM0094-001Base $43.86 + fringe $34.28 = you must pay at least $78.14/hr in wages + benefits. | $43.86 | $34.28 | $78.14 |
TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND UNDER 8 YDS.; TRANSIT MIXERSTEAM0094-001Base $43.56 + fringe $34.28 = you must pay at least $77.84/hr in wages + benefits. | $43.56 | $34.28 | $77.84 |
TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK (2TEAM0094-001Base $43.26 + fringe $34.28 = you must pay at least $77.54/hr in wages + benefits. | $43.26 | $34.28 | $77.54 |
Am I compliant?
Pick the classification and enter what you pay per hour — base wage plus cash fringe or benefit contributions. The math happens right here on this page.
Informational only — this check compares your combined hourly base + fringe against the determination's combined rate. Verify with the contracting agency before relying on it.
Source: SAM.gov wage determination CA20260019, revision 5, published May 18, 2026. Rates are cached and refreshed daily. Always confirm the determination attached to your contract.