CA20260017
Imperial, Los Angeles, Orange, Riverside, San Bernardino, San Luis Obispo, Santa Barbara & Ventura Counties, California
Revision 3 · Published May 18, 2026 · 179 classifications · Residential construction · Latest cached revision
This determination sets federal Davis-Bacon rates for Imperial, Los Angeles, Orange, Riverside, San Bernardino, San Luis Obispo, Santa Barbara & Ventura Counties, California on residential construction. It lists 179 classifications, with base rates from $22.16 (DRYWALL: STOCKER/SCRAPPER: (2) ALL OTHER WORK) to $84.05 (A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION). Every classification lists a numeric fringe.
Showing 179 of 179 classifications
| Classification | Base | Fringe | Total |
|---|---|---|---|
ASBESTOS WORKERS/INSULATORASBE0005-002Base $56.32 + fringe $26.52 = you must pay at least $82.84/hr in wages + benefits. | $56.32 | $26.52 | $82.84 |
FIRE STOP TECHNICIANASBE0005-002Base $39.94 + fringe $20.65 = you must pay at least $60.59/hr in wages + benefits. | $39.94 | $20.65 | $60.59 |
ASBESTOS WORKERS/INSULATORASBE0005-002Base $56.32 + fringe $26.52 = you must pay at least $82.84/hr in wages + benefits. | $56.32 | $26.52 | $82.84 |
FIRE STOP TECHNICIANASBE0005-002Base $39.94 + fringe $20.65 = you must pay at least $60.59/hr in wages + benefits. | $39.94 | $20.65 | $60.59 |
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLERASBE0005-004Base $23.52 + fringe $13.37 = you must pay at least $36.89/hr in wages + benefits. | $23.52 | $13.37 | $36.89 |
BRICKLAYER; MARBLE SETTER (VENTURA COUNTY) *THE WAGE SCALE FOR PREVAILING WAGEBRCA0004-001Base $50.07 + fringe $20.29 = you must pay at least $70.36/hr in wages + benefits. | $50.07 | $20.29 | $70.36 |
BRICKLAYER; MARBLE SETTER (RIVERSIDE & SAN BERNARDINO COUNTIES) *THE WAGE SCALEBRCA0004-001Base $50.07 + fringe $20.29 = you must pay at least $70.36/hr in wages + benefits. | $50.07 | $20.29 | $70.36 |
BRICKLAYER; MARBLE SETTER (ORANGE COUNTY) *THE WAGE SCALE FOR PREVAILING WAGEBRCA0004-001Base $50.07 + fringe $20.29 = you must pay at least $70.36/hr in wages + benefits. | $50.07 | $20.29 | $70.36 |
BRICKLAYER; MARBLE SETTER (LOS ANGELES COUNTY) *THE WAGE SCALE FOR PREVAILINGBRCA0004-001Base $50.07 + fringe $20.29 = you must pay at least $70.36/hr in wages + benefits. | $50.07 | $20.29 | $70.36 |
BRICKLAYER; MARBLE SETTER (IMPERIAL)BRCA0004-004Base $58.81 + fringe $19.14 = you must pay at least $77.95/hr in wages + benefits. | $58.81 | $19.14 | $77.95 |
BRICKLAYER; MARBLE SETTER (SAN LUIS OBISPO AND SANTA BARBARA COUNTIES) *THEBRCA0004-009Base $50.07 + fringe $20.29 = you must pay at least $70.36/hr in wages + benefits. | $50.07 | $20.29 | $70.36 |
TILE FINISHERBRCA0018-001Base $37.96 + fringe $13.77 = you must pay at least $51.73/hr in wages + benefits. | $37.96 | $13.77 | $51.73 |
MARBLE FINISHERBRCA0018-001Base $43.38 + fringe $15.36 = you must pay at least $58.74/hr in wages + benefits. | $43.38 | $15.36 | $58.74 |
TILE LAYER (SAN LUIS OBISPO AND SANTA BARBARA)BRCA0018-002Base $51.82 + fringe $19.32 = you must pay at least $71.14/hr in wages + benefits. | $51.82 | $19.32 | $71.14 |
TILE LAYERBRCA0018-003Base $51.82 + fringe $19.32 = you must pay at least $71.14/hr in wages + benefits. | $51.82 | $19.32 | $71.14 |
TERRAZZO WORKER/SETTERBRCA0018-010Base $49.62 + fringe $15.26 = you must pay at least $64.88/hr in wages + benefits. | $49.62 | $15.26 | $64.88 |
TERRAZZO FINISHERBRCA0018-010Base $42.11 + fringe $14.67 = you must pay at least $56.78/hr in wages + benefits. | $42.11 | $14.67 | $56.78 |
CARPENTER: INSULATION INSTALLERCARP0213-005Base $25.66 + fringe $15.96 = you must pay at least $41.62/hr in wages + benefits. | $25.66 | $15.96 | $41.62 |
CARPENTER: CABINET INSTALLERCARP0213-005Base $40.46 + fringe $16.28 = you must pay at least $56.74/hr in wages + benefits. | $40.46 | $16.28 | $56.74 |
CARPENTER: FENCE BUILDERCARP0213-005Base $39.91 + fringe $15.37 = you must pay at least $55.28/hr in wages + benefits. | $39.91 | $15.37 | $55.28 |
CARPENTER: FRAMER & FINISH CARPENTERCARP0213-005Base $40.75 + fringe $16.28 = you must pay at least $57.03/hr in wages + benefits. | $40.75 | $16.28 | $57.03 |
CARPENTER: ROOF LOADER OF SHINGLESCARP0213-005Base $30.08 + fringe $16.28 = you must pay at least $46.36/hr in wages + benefits. | $30.08 | $16.28 | $46.36 |
CARPENTER: SHINGLERCARP0213-005Base $39.90 + fringe $16.28 = you must pay at least $56.18/hr in wages + benefits. | $39.90 | $16.28 | $56.18 |
CARPENTER: SUBTERRANEAN GARAGE CONCRETE CONSTRUCTION AND CARPENTERS PERFORMINGCARP0213-005Base $39.38 + fringe $16.28 = you must pay at least $55.66/hr in wages + benefits. | $39.38 | $16.28 | $55.66 |
DRYWALL: STOCKER/SCRAPPER: (2) ALL OTHER WORKCARP0213-006Base $22.16 + fringe $8.62 = you must pay at least $30.78/hr in wages + benefits. | $22.16 | $8.62 | $30.78 |
DRYWALL: STOCKER/SCRAPPER: (1) WORK ON WOOD-FRAMED SINGLE FAMILY HOMES, ANDCARP0213-006Base $22.16 + fringe $8.62 = you must pay at least $30.78/hr in wages + benefits. | $22.16 | $8.62 | $30.78 |
DRYWALL: DRYWALL INSTALLER/LATHER: (2) ALL OTHER WORKCARP0213-006Base $51.60 + fringe $16.28 = you must pay at least $67.88/hr in wages + benefits. | $51.60 | $16.28 | $67.88 |
DRYWALL: DRYWALL INSTALLER/LATHER: (1) WORK ON WOOD-FRAMED SINGLE FAMILY HOMESCARP0213-006Base $32.14 + fringe $16.28 = you must pay at least $48.42/hr in wages + benefits. | $32.14 | $16.28 | $48.42 |
MODULAR FURNITURE INSTALLERCARP0721-001Base $25.00 + fringe $13.06 = you must pay at least $38.06/hr in wages + benefits. | $25.00 | $13.06 | $38.06 |
ELECTRICIAN: DOES NOT INCLUDE FIRE ALARM, HOLD-UP ALARM, BURGLAR ALARM ANDELEC0011-003Base $37.63 + fringe $8.41 = you must pay at least $46.04/hr in wages + benefits. | $37.63 | $8.41 | $46.04 |
COMMUNICATIONS SYSTEM: INSTALLER COMMUNICATIONS AND SYSTEMS WORK (LOS ANGELESELEC0011-008Base $46.47 + fringe $18.47 = you must pay at least $64.94/hr in wages + benefits. | $46.47 | $18.47 | $64.94 |
ELECTRICIANS (SANTA BARBARA COUNTY) WORK AT VANDENBERG AFB: $3.75 ADDITIONALELEC0413-002Base $41.00 + fringe $4.73 = you must pay at least $45.73/hr in wages + benefits. | $41.00 | $4.73 | $45.73 |
COMMUNICATIONS SYSTEM: INSTALLER COMMUNICATIONS AND SYSTEMS WORK (SANTA BARBARAELEC0413-004Base $48.13 + fringe $17.49 = you must pay at least $65.62/hr in wages + benefits. | $48.13 | $17.49 | $65.62 |
ELECTRICIAN (RIVERSIDE)ELEC0440-002Base $57.26 + fringe $32.83 = you must pay at least $90.09/hr in wages + benefits. | $57.26 | $32.83 | $90.09 |
COMMUNICATIONS SYSTEM: INSTALLER COMMUNICATIONS AND SYSTEMS WORK (RIVERSIDE ANDELEC0440-005Base $45.23 + fringe $20.47 = you must pay at least $65.70/hr in wages + benefits. | $45.23 | $20.47 | $65.70 |
COMMUNCIATION SYSTEM: TECHNICIAN COMMUNICATIONS AND SYSTEMS WORK (RIVERSIDE ANDELEC0440-005Base $33.09 + fringe $15.89 = you must pay at least $48.98/hr in wages + benefits. | $33.09 | $15.89 | $48.98 |
ELECTRICIAN (ORANGE)ELEC0441-002Base $36.66 + fringe $11.26 = you must pay at least $47.92/hr in wages + benefits. | $36.66 | $11.26 | $47.92 |
ELECTRICIAN (SAN BERNARDINO)ELEC0477-003Base $37.63 + fringe $9.57 = you must pay at least $47.20/hr in wages + benefits. | $37.63 | $9.57 | $47.20 |
ELECTRICIAN: 1 TO 3 STORIES (IMPERIAL)ELEC0569-003Base $40.50 + fringe $8.18 = you must pay at least $48.68/hr in wages + benefits. | $40.50 | $8.18 | $48.68 |
ELECTRICIAN (SAN LUIS OBISPO)ELEC0639-002Base $55.50 + fringe $24.42 = you must pay at least $79.92/hr in wages + benefits. | $55.50 | $24.42 | $79.92 |
COMMUNICATIONS SYSTEM: INSTALLER (SAN LUIS OBISPO COUNTY) SCOPE OF WORKELEC0639-003Base $49.73 + fringe $17.54 = you must pay at least $67.27/hr in wages + benefits. | $49.73 | $17.54 | $67.27 |
COMMUNICATIONS SYSTEM: TECHNICIAN (SAN LUIS OBISPO COUNTY) SCOPE OF WORKELEC0639-003Base $30.89 + fringe $11.66 = you must pay at least $42.55/hr in wages + benefits. | $30.89 | $11.66 | $42.55 |
ELECTRICIAN ALL WORK WITHIN 32 ROAD MILES OR LESS FROM THE NEAREST BASE POINTELEC0952-002Base $53.09 + fringe $31.56 = you must pay at least $84.65/hr in wages + benefits. | $53.09 | $31.56 | $84.65 |
CABLE SPLICER ALL WORK WITHIN 32 ROAD MILES OR LESS FROM THE NEAREST BASE POINTELEC0952-002Base $58.40 + fringe $31.72 = you must pay at least $90.12/hr in wages + benefits. | $58.40 | $31.72 | $90.12 |
COMMUNICATIONS SYSTEM: INSTALLER COMMUNICATIONS AND SYSTEMS WORK (VENTURAELEC0952-006Base $46.47 + fringe $19.22 = you must pay at least $65.69/hr in wages + benefits. | $46.47 | $19.22 | $65.69 |
A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATIONELEV0008-004Base $84.05 + fringe $38.44 = you must pay at least $122.49/hr in wages + benefits. | $84.05 | $38.44 | $122.49 |
ELEVATOR MECHANIC IMPERIAL, LOS ANGELES, ORANGE, RIVERSIDE, SAN BERNARDINOELEV0018-004Base $69.43 + fringe $38.44 = you must pay at least $107.87/hr in wages + benefits. | $69.43 | $38.44 | $107.87 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13: CRANEENGI0012-001Base $52.65 + fringe $25.25 = you must pay at least $77.90/hr in wages + benefits. | $52.65 | $25.25 | $77.90 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 12: CRANEENGI0012-001Base $51.65 + fringe $25.25 = you must pay at least $76.90/hr in wages + benefits. | $51.65 | $25.25 | $76.90 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 11: CRANEENGI0012-001Base $50.65 + fringe $25.25 = you must pay at least $75.90/hr in wages + benefits. | $50.65 | $25.25 | $75.90 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 10: CRANEENGI0012-001Base $49.65 + fringe $25.25 = you must pay at least $74.90/hr in wages + benefits. | $49.65 | $25.25 | $74.90 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 9: CRANEENGI0012-001Base $48.65 + fringe $25.25 = you must pay at least $73.90/hr in wages + benefits. | $48.65 | $25.25 | $73.90 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 8: CRANEENGI0012-001Base $48.48 + fringe $25.25 = you must pay at least $73.73/hr in wages + benefits. | $48.48 | $25.25 | $73.73 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 7: PEDESTALENGI0012-001Base $48.31 + fringe $25.25 = you must pay at least $73.56/hr in wages + benefits. | $48.31 | $25.25 | $73.56 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 6: BRIDGEENGI0012-001Base $48.19 + fringe $25.25 = you must pay at least $73.44/hr in wages + benefits. | $48.19 | $25.25 | $73.44 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 5: HYDRAULICENGI0012-001Base $48.08 + fringe $25.25 = you must pay at least $73.33/hr in wages + benefits. | $48.08 | $25.25 | $73.33 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 4: BRIDGE-TYPEENGI0012-001Base $47.86 + fringe $25.25 = you must pay at least $73.11/hr in wages + benefits. | $47.86 | $25.25 | $73.11 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 3: A-FRAME ORENGI0012-001Base $47.72 + fringe $25.25 = you must pay at least $72.97/hr in wages + benefits. | $47.72 | $25.25 | $72.97 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 2: TRUCK CRANEENGI0012-001Base $47.43 + fringe $25.25 = you must pay at least $72.68/hr in wages + benefits. | $47.43 | $25.25 | $72.68 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 1: ENGINEERENGI0012-001Base $46.65 + fringe $25.25 = you must pay at least $71.90/hr in wages + benefits. | $46.65 | $25.25 | $71.90 |
OPERATOR: POWER EQUIPMENT GROUP 9: HEAVY DUTY REPAIRMANENGI0012-001Base $49.29 + fringe $25.25 = you must pay at least $74.54/hr in wages + benefits. | $49.29 | $25.25 | $74.54 |
OPERATOR: POWER EQUIPMENT GROUP 8: ASPHALT OR CONCRETE SPREADING OPERATORENGI0012-001Base $48.19 + fringe $25.25 = you must pay at least $73.44/hr in wages + benefits. | $48.19 | $25.25 | $73.44 |
OPERATOR: POWER EQUIPMENT GROUP 7: WELDER - GENERALENGI0012-001Base $49.18 + fringe $25.25 = you must pay at least $74.43/hr in wages + benefits. | $49.18 | $25.25 | $74.43 |
OPERATOR: POWER EQUIPMENT GROUP 6: ARTICULATING MATERIAL HAULER; ASPHALT PLANTENGI0012-001Base $48.08 + fringe $25.25 = you must pay at least $73.33/hr in wages + benefits. | $48.08 | $25.25 | $73.33 |
OPERATOR: POWER EQUIPMENT GROUP 5: EQUIPMENT GREASER (GREASE TRUCK/MULTI SHIFT)ENGI0012-001Base $48.96 + fringe $25.25 = you must pay at least $74.21/hr in wages + benefits. | $48.96 | $25.25 | $74.21 |
OPERATOR: POWER EQUIPMENT GROUP 4: ASPHALT PLANT FIREMAN; BACKHOE OPERATORENGI0012-001Base $47.86 + fringe $25.25 = you must pay at least $73.11/hr in wages + benefits. | $47.86 | $25.25 | $73.11 |
OPERATOR: POWER EQUIPMENT GROUP 3: ASPHALT-RUBBER BLEND OPERATOR; BOBCAT ORENGI0012-001Base $46.37 + fringe $25.25 = you must pay at least $71.62/hr in wages + benefits. | $46.37 | $25.25 | $71.62 |
OPERATOR: POWER EQUIPMENT GROUP 2: ASPHALT-RUBBER PLANT OPERATOR (NURSE TANKENGI0012-001Base $46.08 + fringe $25.25 = you must pay at least $71.33/hr in wages + benefits. | $46.08 | $25.25 | $71.33 |
OPERATOR: POWER EQUIPMENT GROUP 25: CONCRETE PUMP OPERATOR-TRUCK MOUNTEDENGI0012-001Base $49.98 + fringe $25.25 = you must pay at least $75.23/hr in wages + benefits. | $49.98 | $25.25 | $75.23 |
OPERATOR: POWER EQUIPMENT GROUP 24: RUBBER-TIRED EARTH-MOVING EQUIPMENTENGI0012-001Base $49.81 + fringe $25.25 = you must pay at least $75.06/hr in wages + benefits. | $49.81 | $25.25 | $75.06 |
OPERATOR: POWER EQUIPMENT GROUP 23: RUBBER-TIRED EARTH-MOVING EQUIPMENTENGI0012-001Base $49.69 + fringe $25.25 = you must pay at least $74.94/hr in wages + benefits. | $49.69 | $25.25 | $74.94 |
OPERATOR: POWER EQUIPMENT GROUP 22: RUBBER-TIRED EARTH-MOVING EQUIPMENTENGI0012-001Base $49.58 + fringe $25.25 = you must pay at least $74.83/hr in wages + benefits. | $49.58 | $25.25 | $74.83 |
OPERATOR: POWER EQUIPMENT GROUP 21: RUBBER-TIRED EARTH-MOVING EQUIPMENTENGI0012-001Base $49.48 + fringe $25.25 = you must pay at least $74.73/hr in wages + benefits. | $49.48 | $25.25 | $74.73 |
OPERATOR: POWER EQUIPMENT GROUP 20: RUBBER-TIRED EARTH-MOVING EQUIPMENTENGI0012-001Base $49.31 + fringe $25.25 = you must pay at least $74.56/hr in wages + benefits. | $49.31 | $25.25 | $74.56 |
OPERATOR: POWER EQUIPMENT GROUP 1: BARGEMAN; BRAKEMAN; COMPRESSOR OPERATORENGI0012-001Base $45.30 + fringe $25.25 = you must pay at least $70.55/hr in wages + benefits. | $45.30 | $25.25 | $70.55 |
OPERATOR: POWER EQUIPMENT GROUP 19: ROTEX CONCRETE BELT OPERATOR (OR SIMILARENGI0012-001Base $49.19 + fringe $25.25 = you must pay at least $74.44/hr in wages + benefits. | $49.19 | $25.25 | $74.44 |
OPERATOR: POWER EQUIPMENT GROUP 18: RUBBER-TIRED EARTH-MOVING EQUIPMENTENGI0012-001Base $49.08 + fringe $25.25 = you must pay at least $74.33/hr in wages + benefits. | $49.08 | $25.25 | $74.33 |
OPERATOR: POWER EQUIPMENT GROUP 17: RUBBER-TIRED EARTH-MOVING EQUIPMENTENGI0012-001Base $48.98 + fringe $25.25 = you must pay at least $74.23/hr in wages + benefits. | $48.98 | $25.25 | $74.23 |
OPERATOR: POWER EQUIPMENT GROUP 16: RUBBER-TIRED EARTH-MOVING EQUIPMENTENGI0012-001Base $48.81 + fringe $25.25 = you must pay at least $74.06/hr in wages + benefits. | $48.81 | $25.25 | $74.06 |
OPERATOR: POWER EQUIPMENT GROUP 15: RUBBER-TIRED EARTH-MOVING EQUIPMENTENGI0012-001Base $48.69 + fringe $25.25 = you must pay at least $73.94/hr in wages + benefits. | $48.69 | $25.25 | $73.94 |
OPERATOR: POWER EQUIPMENT GROUP 14: CANAL LINER OPERATOR; CANAL TRIMMERENGI0012-001Base $48.61 + fringe $25.25 = you must pay at least $73.86/hr in wages + benefits. | $48.61 | $25.25 | $73.86 |
OPERATOR: POWER EQUIPMENT GROUP 13: RUBBER-TIRED EARTH-MOVING EQUIPMENTENGI0012-001Base $48.58 + fringe $25.25 = you must pay at least $73.83/hr in wages + benefits. | $48.58 | $25.25 | $73.83 |
OPERATOR: POWER EQUIPMENT GROUP 12: AUTO GRADER OPERATOR; AUTOMATIC SLIP FORMENGI0012-001Base $49.48 + fringe $25.25 = you must pay at least $74.73/hr in wages + benefits. | $49.48 | $25.25 | $74.73 |
OPERATOR: POWER EQUIPMENT GROUP 11: HEAVY DUTY REPAIRMAN - WELDER COMBINATIONENGI0012-001Base $49.41 + fringe $25.25 = you must pay at least $74.66/hr in wages + benefits. | $49.41 | $25.25 | $74.66 |
OPERATOR: POWER EQUIPMENT GROUP 10: DRILLING MACHINE OPERATOR, BUCKET OR AUGERENGI0012-001Base $48.31 + fringe $25.25 = you must pay at least $73.56/hr in wages + benefits. | $48.31 | $25.25 | $73.56 |
IRONWORKER (ORNAMENTAL, REINFORCING AND STRUCTURAL)IRON0433-006Base $50.70 + fringe $35.15 = you must pay at least $85.85/hr in wages + benefits. | $50.70 | $35.15 | $85.85 |
IRONWORKER (FENCE ERECTOR)IRON0433-006Base $45.78 + fringe $26.51 = you must pay at least $72.29/hr in wages + benefits. | $45.78 | $26.51 | $72.29 |
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTINGLABO0220-003Base $38.24 + fringe $20.09 = you must pay at least $58.33/hr in wages + benefits. | $38.24 | $20.09 | $58.33 |
LABORER GROUP 4 ANY WORKER EXPOSED TO RAW SEWAGE; ASPHALT RAKER, LUTE PERSONLABO0220-003Base $37.89 + fringe $20.09 = you must pay at least $57.98/hr in wages + benefits. | $37.89 | $20.09 | $57.98 |
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILELABO0220-003Base $36.34 + fringe $20.09 = you must pay at least $56.43/hr in wages + benefits. | $36.34 | $20.09 | $56.43 |
LABORER GROUP 2 ASBESTOS ABATEMENT; ASPHALT SHOVELER; CEMENT DUMPERLABO0220-003Base $35.79 + fringe $20.09 = you must pay at least $55.88/hr in wages + benefits. | $35.79 | $20.09 | $55.88 |
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FORLABO0220-003Base $35.24 + fringe $20.09 = you must pay at least $55.33/hr in wages + benefits. | $35.24 | $20.09 | $55.33 |
BRICK TENDER (SAN LUIS OBISPO AND SANTA BARBARA COUNTIES)LABO0220-006Base $42.60 + fringe $22.13 = you must pay at least $64.73/hr in wages + benefits. | $42.60 | $22.13 | $64.73 |
BRICK TENDER (LOS ANGELES COUNTY)LABO0300-002Base $42.60 + fringe $22.13 = you must pay at least $64.73/hr in wages + benefits. | $42.60 | $22.13 | $64.73 |
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTINGLABO0300-004Base $42.23 + fringe $23.30 = you must pay at least $65.53/hr in wages + benefits. | $42.23 | $23.30 | $65.53 |
LABORER GROUP 4 ANY WORKER EXPOSED TO RAW SEWAGE; ASPHALT RAKER, LUTE PERSONLABO0300-004Base $41.88 + fringe $23.30 = you must pay at least $65.18/hr in wages + benefits. | $41.88 | $23.30 | $65.18 |
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILELABO0300-004Base $40.33 + fringe $23.30 = you must pay at least $63.63/hr in wages + benefits. | $40.33 | $23.30 | $63.63 |
LABORER GROUP 2 ASBESTOS ABATEMENT; ASPHALT SHOVELER; CEMENT DUMPERLABO0300-004Base $39.78 + fringe $23.30 = you must pay at least $63.08/hr in wages + benefits. | $39.78 | $23.30 | $63.08 |
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FORLABO0300-004Base $39.23 + fringe $23.30 = you must pay at least $62.53/hr in wages + benefits. | $39.23 | $23.30 | $62.53 |
ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIALLABO0300-006Base $46.48 + fringe $25.93 = you must pay at least $72.41/hr in wages + benefits. | $46.48 | $25.93 | $72.41 |
LABORERS: (2) ALL OTHER WORK RESIDENTIAL, 3 STORIES AND UNDERLABO0300-007Base $46.00 + fringe $22.70 = you must pay at least $68.70/hr in wages + benefits. | $46.00 | $22.70 | $68.70 |
LABORERS: (1) CLEANUP, FENCING (CHAIN LINK OR WOOD), LANDSCAPING RESIDENTIAL, 3LABO0300-007Base $45.00 + fringe $22.70 = you must pay at least $67.70/hr in wages + benefits. | $45.00 | $22.70 | $67.70 |
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTINGLABO0585-002Base $38.24 + fringe $20.09 = you must pay at least $58.33/hr in wages + benefits. | $38.24 | $20.09 | $58.33 |
LABORER GROUP 4 ANY WORKER EXPOSED TO RAW SEWAGE; ASPHALT RAKER, LUTE PERSONLABO0585-002Base $37.89 + fringe $20.09 = you must pay at least $57.98/hr in wages + benefits. | $37.89 | $20.09 | $57.98 |
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILELABO0585-002Base $36.34 + fringe $20.09 = you must pay at least $56.43/hr in wages + benefits. | $36.34 | $20.09 | $56.43 |
LABORER GROUP 2 ASBESTOS ABATEMENT; ASPHALT SHOVELER; CEMENT DUMPERLABO0585-002Base $35.79 + fringe $20.09 = you must pay at least $55.88/hr in wages + benefits. | $35.79 | $20.09 | $55.88 |
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FORLABO0585-002Base $35.24 + fringe $20.09 = you must pay at least $55.33/hr in wages + benefits. | $35.24 | $20.09 | $55.33 |
BRICK TENDER (VENTURA COUNTY)LABO0585-004Base $42.60 + fringe $22.13 = you must pay at least $64.73/hr in wages + benefits. | $42.60 | $22.13 | $64.73 |
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTINGLABO0652-002Base $38.24 + fringe $20.09 = you must pay at least $58.33/hr in wages + benefits. | $38.24 | $20.09 | $58.33 |
LABORER GROUP 4 ANY WORKER EXPOSED TO RAW SEWAGE; ASPHALT RAKER, LUTE PERSONLABO0652-002Base $37.89 + fringe $20.09 = you must pay at least $57.98/hr in wages + benefits. | $37.89 | $20.09 | $57.98 |
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILELABO0652-002Base $36.34 + fringe $20.09 = you must pay at least $56.43/hr in wages + benefits. | $36.34 | $20.09 | $56.43 |
LABORER GROUP 2 ASBESTOS ABATEMENT; ASPHALT SHOVELER; CEMENT DUMPERLABO0652-002Base $35.79 + fringe $20.09 = you must pay at least $55.88/hr in wages + benefits. | $35.79 | $20.09 | $55.88 |
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FORLABO0652-002Base $35.24 + fringe $20.09 = you must pay at least $55.33/hr in wages + benefits. | $35.24 | $20.09 | $55.33 |
BRICK TENDER (ORANGE COUNTY)LABO0652-004Base $42.60 + fringe $22.13 = you must pay at least $64.73/hr in wages + benefits. | $42.60 | $22.13 | $64.73 |
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTINGLABO0783-003Base $38.24 + fringe $20.09 = you must pay at least $58.33/hr in wages + benefits. | $38.24 | $20.09 | $58.33 |
LABORER GROUP 4 ANY WORKER EXPOSED TO RAW SEWAGE; ASPHALT RAKER, LUTE PERSONLABO0783-003Base $37.89 + fringe $20.09 = you must pay at least $57.98/hr in wages + benefits. | $37.89 | $20.09 | $57.98 |
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILELABO0783-003Base $36.34 + fringe $20.09 = you must pay at least $56.43/hr in wages + benefits. | $36.34 | $20.09 | $56.43 |
LABORER GROUP 2 ASBESTOS ABATEMENT; ASPHALT SHOVELER; CEMENT DUMPERLABO0783-003Base $35.79 + fringe $20.09 = you must pay at least $55.88/hr in wages + benefits. | $35.79 | $20.09 | $55.88 |
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FORLABO0783-003Base $35.24 + fringe $20.09 = you must pay at least $55.33/hr in wages + benefits. | $35.24 | $20.09 | $55.33 |
BRICK TENDER (SAN BERNARDINO COUNTY)LABO0783-006Base $42.60 + fringe $22.13 = you must pay at least $64.73/hr in wages + benefits. | $42.60 | $22.13 | $64.73 |
LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTICLABO1184-001Base $54.35 + fringe $23.97 = you must pay at least $78.32/hr in wages + benefits. | $54.35 | $23.97 | $78.32 |
LABORERS:, STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATORLABO1184-001Base $52.61 + fringe $23.97 = you must pay at least $76.58/hr in wages + benefits. | $52.61 | $23.97 | $76.58 |
LABORERS:, STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POTLABO1184-001Base $50.60 + fringe $23.97 = you must pay at least $74.57/hr in wages + benefits. | $50.60 | $23.97 | $74.57 |
LABORERS:, STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALINGLABO1184-001Base $49.30 + fringe $23.97 = you must pay at least $73.27/hr in wages + benefits. | $49.30 | $23.97 | $73.27 |
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC TRACKING LOCATORLABO1184-001Base $51.96 + fringe $20.86 = you must pay at least $72.82/hr in wages + benefits. | $51.96 | $20.86 | $72.82 |
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL DIRECTIONAL DRILLLABO1184-001Base $49.96 + fringe $20.86 = you must pay at least $70.82/hr in wages + benefits. | $49.96 | $20.86 | $70.82 |
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE OPERATOR/HAULERLABO1184-001Base $48.11 + fringe $20.86 = you must pay at least $68.97/hr in wages + benefits. | $48.11 | $20.86 | $68.97 |
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW LABORERLABO1184-001Base $47.94 + fringe $20.86 = you must pay at least $68.80/hr in wages + benefits. | $47.94 | $20.86 | $68.80 |
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTINGLABO1184-003Base $38.24 + fringe $20.09 = you must pay at least $58.33/hr in wages + benefits. | $38.24 | $20.09 | $58.33 |
LABORER GROUP 4 ANY WORKER EXPOSED TO RAW SEWAGE; ASPHALT RAKER, LUTE PERSONLABO1184-003Base $37.89 + fringe $20.09 = you must pay at least $57.98/hr in wages + benefits. | $37.89 | $20.09 | $57.98 |
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILELABO1184-003Base $36.34 + fringe $20.09 = you must pay at least $56.43/hr in wages + benefits. | $36.34 | $20.09 | $56.43 |
LABORER GROUP 2 ASBESTOS ABATEMENT; ASPHALT SHOVELER; CEMENT DUMPERLABO1184-003Base $35.79 + fringe $20.09 = you must pay at least $55.88/hr in wages + benefits. | $35.79 | $20.09 | $55.88 |
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FORLABO1184-003Base $35.24 + fringe $20.09 = you must pay at least $55.33/hr in wages + benefits. | $35.24 | $20.09 | $55.33 |
BRICK TENDER (IMPERIAL AND RIVERSIDE COUNTIES)LABO1184-005Base $42.60 + fringe $22.13 = you must pay at least $64.73/hr in wages + benefits. | $42.60 | $22.13 | $64.73 |
LABORERS: PLASTER TENDER (4 STORIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PERLABO1414-002Base $39.47 + fringe $23.32 = you must pay at least $62.79/hr in wages + benefits. | $39.47 | $23.32 | $62.79 |
LABORERS: PLASTER TENDER (1 TO 3 STORIES) WORK ON A SWING STAGE SCAFFOLD: $1.00LABO1414-002Base $39.47 + fringe $23.32 = you must pay at least $62.79/hr in wages + benefits. | $39.47 | $23.32 | $62.79 |
LABORERS: PLASTER CLEAN-UP LABORER (4 STORIES) WORK ON A SWING STAGE SCAFFOLDLABO1414-002Base $36.92 + fringe $23.32 = you must pay at least $60.24/hr in wages + benefits. | $36.92 | $23.32 | $60.24 |
LABORERS: PLASTER CLEAN-UP LABORER (1 TO 3 STORIES) WORK ON A SWING STAGELABO1414-002Base $36.92 + fringe $23.32 = you must pay at least $60.24/hr in wages + benefits. | $36.92 | $23.32 | $60.24 |
PAINTER, INCLUDING LEAD ABATEMENT: (3) JOURNEYMAN & INDUSTRIAL (SAN LUIS OBISPOPAIN0036-005Base $34.02 + fringe $16.49 = you must pay at least $50.51/hr in wages + benefits. | $34.02 | $16.49 | $50.51 |
PAINTER, INCLUDING LEAD ABATEMENT: (3) JOURNEYMAN & INDUSTRIALPAIN0036-005Base $34.02 + fringe $16.49 = you must pay at least $50.51/hr in wages + benefits. | $34.02 | $16.49 | $50.51 |
PAINTER, INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORKPAIN0036-005Base $32.12 + fringe $16.09 = you must pay at least $48.21/hr in wages + benefits. | $32.12 | $16.09 | $48.21 |
PAINTER, INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK (SAN LUIS OBISPO, SANTAPAIN0036-005Base $30.04 + fringe $16.03 = you must pay at least $46.07/hr in wages + benefits. | $30.04 | $16.03 | $46.07 |
PAINTER, INCLUDING LEAD ABATEMENT: (1) REPAINTPAIN0036-005Base $28.59 + fringe $15.97 = you must pay at least $44.56/hr in wages + benefits. | $28.59 | $15.97 | $44.56 |
PAINTER, INCLUDING LEAD ABATEMENT: (1) REPAINT (SAN LUIS OBISPO, SANTA BARBARAPAIN0036-005Base $25.40 + fringe $15.87 = you must pay at least $41.27/hr in wages + benefits. | $25.40 | $15.87 | $41.27 |
DRYWALL FINISHER/TAPER IMPERIALPAIN0036-011Base $32.27 + fringe $14.70 = you must pay at least $46.97/hr in wages + benefits. | $32.27 | $14.70 | $46.97 |
GLAZIER (IMPERIAL)PAIN0036-014Base $52.90 + fringe $22.16 = you must pay at least $75.06/hr in wages + benefits. | $52.90 | $22.16 | $75.06 |
GLAZIERPAIN0036-018Base $53.05 + fringe $30.64 = you must pay at least $83.69/hr in wages + benefits. | $53.05 | $30.64 | $83.69 |
SOFT FLOOR LAYER (IMPERIAL)PAIN0036-020Base $40.77 + fringe $19.37 = you must pay at least $60.14/hr in wages + benefits. | $40.77 | $19.37 | $60.14 |
GLAZIER (SAN LUIS OBISPO)PAIN0169-007Base $49.22 + fringe $30.47 = you must pay at least $79.69/hr in wages + benefits. | $49.22 | $30.47 | $79.69 |
SOFT FLOOR LAYERPAIN1247-003Base $45.15 + fringe $19.43 = you must pay at least $64.58/hr in wages + benefits. | $45.15 | $19.43 | $64.58 |
PLASTERER: 4-STORIES IMPERIAL, KERN, LOS ANGELES, ORANGE, RIVERSIDE, SANPLAS0200-002Base $47.37 + fringe $19.64 = you must pay at least $67.01/hr in wages + benefits. | $47.37 | $19.64 | $67.01 |
PLASTERER: 1 - 3 STORIES IMPERIAL, KERN, LOS ANGELES, ORANGE, RIVERSIDE, SANPLAS0200-002Base $44.34 + fringe $19.64 = you must pay at least $63.98/hr in wages + benefits. | $44.34 | $19.64 | $63.98 |
CEMENT MASON/CONCRETE FINISHERPLAS0500-003Base $47.70 + fringe $27.07 = you must pay at least $74.77/hr in wages + benefits. | $47.70 | $27.07 | $74.77 |
PLUMBER/PIPEFITTER (RESIDENTIAL)PLUM0016-011Base $48.83 + fringe $22.73 = you must pay at least $71.56/hr in wages + benefits. | $48.83 | $22.73 | $71.56 |
REFRIGERATION MECHANIC: REFRIGERATION FITTER (LOS ANGELES AND ORANGE)PLUM0250-001Base $57.65 + fringe $25.01 = you must pay at least $82.66/hr in wages + benefits. | $57.65 | $25.01 | $82.66 |
PLUMBER (SEWER & STORM DRAIN WORK)PLUM0345-001Base $48.84 + fringe $23.58 = you must pay at least $72.42/hr in wages + benefits. | $48.84 | $23.58 | $72.42 |
PLUMBER (LANDSCAPE/IRRIGATION FITTER)PLUM0345-001Base $44.75 + fringe $26.20 = you must pay at least $70.95/hr in wages + benefits. | $44.75 | $26.20 | $70.95 |
ROOFERROOF0036-001Base $51.58 + fringe $20.73 = you must pay at least $72.31/hr in wages + benefits. | $51.58 | $20.73 | $72.31 |
ROOFER (IMPERIAL)ROOF0045-003Base $42.80 + fringe $12.64 = you must pay at least $55.44/hr in wages + benefits. | $42.80 | $12.64 | $55.44 |
SPRINKLER FITTER: (AREA 2) AREA 2: SAN LUIS OBISPO, SANTA BARBARA COUNTIESSFCA0669-005Base $49.69 + fringe $29.72 = you must pay at least $79.41/hr in wages + benefits. | $49.69 | $29.72 | $79.41 |
SPRINKLER FITTER: (AREA 1) AREA 1: IMPERIAL COUNTY; LOS ANGELES COUNTYSFCA0669-005Base $50.79 + fringe $29.80 = you must pay at least $80.59/hr in wages + benefits. | $50.79 | $29.80 | $80.59 |
SPRINKLER FITTERSFCA0709-002Base $58.60 + fringe $33.65 = you must pay at least $92.25/hr in wages + benefits. | $58.60 | $33.65 | $92.25 |
SHEET METAL WORKER: (AREA 1) AREA 1: LOS ANGELES COUNTYSHEE0105-001Base $33.10 + fringe $10.81 = you must pay at least $43.91/hr in wages + benefits. | $33.10 | $10.81 | $43.91 |
SHEET METAL WORKER: (AREA 2) AREA 2: LOS ANGELES (Remainder), ORANGE, RIVERSIDESHEE0105-001Base $29.54 + fringe $19.09 = you must pay at least $48.63/hr in wages + benefits. | $29.54 | $19.09 | $48.63 |
SHEET METAL TECHNICIAN (IMPERIA) SHEET METAL TECHNICIAN - SCOPE: A. EXISTINGSHEE0206-003Base $38.65 + fringe $10.31 = you must pay at least $48.96/hr in wages + benefits. | $38.65 | $10.31 | $48.96 |
SHEET METAL WORKER (IMPERIAL)SHEE0206-003Base $51.45 + fringe $30.92 = you must pay at least $82.37/hr in wages + benefits. | $51.45 | $30.92 | $82.37 |
SHEET METAL WORKER (SAN LUIS OBISPO, SANTA BARBARA AND VENTURA) HOLIDAYS: NEWSHEE0273-001Base $46.87 + fringe $31.15 = you must pay at least $78.02/hr in wages + benefits. | $46.87 | $31.15 | $78.02 |
TRUCK DRIVERS: GROUP 12 BOOM TRUCK 17K AND ABOVE WORK ON ALL MILITARY BASESTEAM0011-001Base $44.05 + fringe $35.69 = you must pay at least $79.74/hr in wages + benefits. | $44.05 | $35.69 | $79.74 |
TRUCK DRIVERS: GROUP 11 WATER PULL - TWIN ENGINE; WATER PULL - TWIN ENGINE WITHTEAM0011-001Base $43.62 + fringe $35.69 = you must pay at least $79.31/hr in wages + benefits. | $43.62 | $35.69 | $79.31 |
TRUCK DRIVERS: GROUP 10 DUMP TRUCK - 50 YDS. OR MORE WATER LEVEL; WATER PULLTEAM0011-001Base $43.12 + fringe $35.69 = you must pay at least $78.81/hr in wages + benefits. | $43.12 | $35.69 | $78.81 |
TRUCK DRIVERS: GROUP 9 TRUCK REPAIR PERSON/WELDER; LOW BED DRIVER, 9 AXLES ORTEAM0011-001Base $42.82 + fringe $35.69 = you must pay at least $78.51/hr in wages + benefits. | $42.82 | $35.69 | $78.51 |
TRUCK DRIVERS: GROUP 8 DUMP TRUCK, 25 YDS. TO 49 YDS. WATER LEVEL; TRUCK REPAIRTEAM0011-001Base $42.62 + fringe $35.69 = you must pay at least $78.31/hr in wages + benefits. | $42.62 | $35.69 | $78.31 |
TRUCK DRIVERS: GROUP 7 A Frame, Swedish crane or similar; Forklift driver; RossTEAM0011-001Base $42.37 + fringe $35.69 = you must pay at least $78.06/hr in wages + benefits. | $42.37 | $35.69 | $78.06 |
TRUCK DRIVERS: GROUP 6 TRANSIT MIX TRUCK, 3 YDS. OR MORE; DUMPCRETE TRUCKTEAM0011-001Base $42.12 + fringe $35.69 = you must pay at least $77.81/hr in wages + benefits. | $42.12 | $35.69 | $77.81 |
TRUCK DRIVERS: GROUP 5 WATER TRUCK, 3 OR MORE AXLES; TRUCK GREASER AND TIRETEAM0011-001Base $42.09 + fringe $35.69 = you must pay at least $77.78/hr in wages + benefits. | $42.09 | $35.69 | $77.78 |
TRUCK DRIVERS: GROUP 4 DRIVER OF TRANSIT MIX TRUCK, UNDER 3 YDS.; DUMPCRETETEAM0011-001Base $42.06 + fringe $35.69 = you must pay at least $77.75/hr in wages + benefits. | $42.06 | $35.69 | $77.75 |
TRUCK DRIVERS: GROUP 3 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 3 AXLESTEAM0011-001Base $41.87 + fringe $35.69 = you must pay at least $77.56/hr in wages + benefits. | $41.87 | $35.69 | $77.56 |
TRUCK DRIVERS: GROUP 2 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 2 AXLESTEAM0011-001Base $41.74 + fringe $35.69 = you must pay at least $77.43/hr in wages + benefits. | $41.74 | $35.69 | $77.43 |
TRUCK DRIVERS: GROUP 1 TRUCK DRIVER WORK ON ALL MILITARY BASES - $3.00 PER HOURTEAM0011-001Base $41.59 + fringe $35.69 = you must pay at least $77.28/hr in wages + benefits. | $41.59 | $35.69 | $77.28 |
Am I compliant?
Pick the classification and enter what you pay per hour — base wage plus cash fringe or benefit contributions. The math happens right here on this page.
Informational only — this check compares your combined hourly base + fringe against the determination's combined rate. Verify with the contracting agency before relying on it.
How to read this wage determination
The wage determination shows base hourly rates and fringe rates by classification. You must pay the total (base + fringe) as the floor. This can be cash wages, qualifying benefits, or a mix — but the combined value must meet or exceed the total. If the fringe column shows '*', this means the rate is defined elsewhere (often a collective bargaining agreement). Never treat '*' as $0 — you must locate the correct source to calculate the full obligation.
Counties listed are where these rates apply. Construction type (building, residential, heavy, or highway) dictates which rates to use. A highway project in County A uses different rates than a building project in the same county. Always match the project type exactly.
The revision number (e.g., "Mod 5") tracks updates. Only the wage determination attached to your contract is legally binding — even if newer versions exist. Verify the revision number in your contract documents. PrevailMap caches federal WDs for reference, but your contractual WD controls. This is informational, not legal advice.
New to this? How federal Davis-Bacon prevailing wage works →
Related California determinations near here
- Imperial CountyCA20260002 · Building · 138 classifications
- San Luis Obispo CountyCA20260012 · Building · 129 classifications
- Santa Barbara CountyCA20260014 · Building · 130 classifications
- Ventura CountyCA20260015 · Building · 128 classifications
- Los Angeles CountyCA20260022 · Building · 134 classifications
- Orange CountyCA20260024 · Building · 131 classifications
What this means for your payroll
On covered federal jobs, you must pay the full prevailing wage (base rate + fringe) to laborers and mechanics weekly. The obligation is the total rate — you can meet it with cash wages, bona fide benefits, or a mix. Every week, submit certified payroll (federal form WH-347) with a signed Statement of Compliance. Missing either is a violation.
If you’d rather not prepare the WH-347 and Statement of Compliance manually, WageSeal (from our team) generates them automatically. This isn’t legal advice — always confirm requirements with your contract or advisor.
Source: SAM.gov wage determination CA20260017, revision 3, published May 18, 2026. Rates are cached and refreshed daily from SAM.gov (last verified August 13, 2026). Always confirm the determination attached to your contract.