TX20260261

Midland County, Texas

Revision 1 · Published May 18, 2026 · 38 classifications · Building construction · Latest cached revision

Showing 38 of 38 classifications

Prevailing wage rates for TX20260261: classification, base hourly rate, fringe hourly rate and the total of both
ClassificationBaseFringeTotal
BOILERMAKERBOIL0074-003

Base $33.17 + fringe $24.92 = you must pay at least $58.09/hr in wages + benefits.

$33.17$24.92$58.09
POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER)ENGI0178-005

Base $32.35 + fringe $13.10 = you must pay at least $45.45/hr in wages + benefits.

$32.35$13.10$45.45
POWER EQUIPMENT OPERATOR ((1) TOWER CRANE)ENGI0178-005

Base $32.85 + fringe $13.10 = you must pay at least $45.95/hr in wages + benefits.

$32.85$13.10$45.95
IRONWORKER: ORNAMENTALIRON0084-011

Base $28.26 + fringe $8.13 = you must pay at least $36.39/hr in wages + benefits.

$28.26$8.13$36.39
PLUMBERPLUM0404-001

Base $28.64 + fringe $10.65 = you must pay at least $39.29/hr in wages + benefits.

$28.64$10.65$39.29
TRUCK DRIVER: WATER TRUCKSUTX2014-037

Base $12.00 + fringe $4.11 = you must pay at least $16.11/hr in wages + benefits.

$12.00$4.11$16.11
TRUCK DRIVER: SEMI-TRAILER TRUCKSUTX2014-037

Base $12.50 + fringe $0.00 = you must pay at least $12.50/hr in wages + benefits.

$12.50$0.00$12.50
TRUCK DRIVER: FLATBED TRUCKSUTX2014-037

Base $19.65 + fringe $8.57 = you must pay at least $28.22/hr in wages + benefits.

$19.65$8.57$28.22
TRUCK DRIVER: DUMP TRUCKSUTX2014-037

Base $12.39 + fringe $1.18 = you must pay at least $13.57/hr in wages + benefits.

$12.39$1.18$13.57
TILE SETTERSUTX2014-037

Base $14.74 + fringe $0.00 = you must pay at least $14.74/hr in wages + benefits.

$14.74$0.00$14.74
TILE FINISHERSUTX2014-037

Base $11.22 + fringe $0.00 = you must pay at least $11.22/hr in wages + benefits.

$11.22$0.00$11.22
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIONSUTX2014-037

Base $19.50 + fringe $0.00 = you must pay at least $19.50/hr in wages + benefits.

$19.50$0.00$19.50
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)SUTX2014-037

Base $22.73 + fringe $7.52 = you must pay at least $30.25/hr in wages + benefits.

$22.73$7.52$30.25
ROOFERSUTX2014-037

Base $14.75 + fringe $0.00 = you must pay at least $14.75/hr in wages + benefits.

$14.75$0.00$14.75
PIPEFITTERSUTX2014-037

Base $25.80 + fringe $8.55 = you must pay at least $34.35/hr in wages + benefits.

$25.80$8.55$34.35
PAINTER: BRUSH, ROLLER, AND SPRAYSUTX2014-037

Base $15.00 + fringe $0.73 = you must pay at least $15.73/hr in wages + benefits.

$15.00$0.73$15.73
OPERATOR: ROLLERSUTX2014-037

Base $12.70 + fringe $0.00 = you must pay at least $12.70/hr in wages + benefits.

$12.70$0.00$12.70
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)SUTX2014-037

Base $16.03 + fringe $0.00 = you must pay at least $16.03/hr in wages + benefits.

$16.03$0.00$16.03
OPERATOR: MECHANICSUTX2014-037

Base $17.52 + fringe $3.33 = you must pay at least $20.85/hr in wages + benefits.

$17.52$3.33$20.85
OPERATOR: LOADERSUTX2014-037

Base $13.55 + fringe $0.94 = you must pay at least $14.49/hr in wages + benefits.

$13.55$0.94$14.49
OPERATOR: GRADER/BLADESUTX2014-037

Base $13.37 + fringe $0.00 = you must pay at least $13.37/hr in wages + benefits.

$13.37$0.00$13.37
OPERATOR: FORKLIFTSUTX2014-037

Base $14.83 + fringe $0.00 = you must pay at least $14.83/hr in wages + benefits.

$14.83$0.00$14.83
OPERATOR: DRILLSUTX2014-037

Base $16.22 + fringe $0.34 = you must pay at least $16.56/hr in wages + benefits.

$16.22$0.34$16.56
OPERATOR: BULLDOZERSUTX2014-037

Base $18.29 + fringe $1.31 = you must pay at least $19.60/hr in wages + benefits.

$18.29$1.31$19.60
OPERATOR: BOBCAT/SKID STEER/SKID LOADERSUTX2014-037

Base $13.93 + fringe $0.00 = you must pay at least $13.93/hr in wages + benefits.

$13.93$0.00$13.93
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOESUTX2014-037

Base $14.25 + fringe $0.00 = you must pay at least $14.25/hr in wages + benefits.

$14.25$0.00$14.25
LABORER: ROOF TEAROFFSUTX2014-037

Base $11.28 + fringe $0.00 = you must pay at least $11.28/hr in wages + benefits.

$11.28$0.00$11.28
LABORER: PIPELAYERSUTX2014-037

Base $12.49 + fringe $2.13 = you must pay at least $14.62/hr in wages + benefits.

$12.49$2.13$14.62
LABORER: MASON TENDER - CEMENT/CONCRETESUTX2014-037

Base $10.58 + fringe $0.00 = you must pay at least $10.58/hr in wages + benefits.

$10.58$0.00$10.58
LABORER: MASON TENDER - BRICKSUTX2014-037

Base $11.38 + fringe $0.00 = you must pay at least $11.38/hr in wages + benefits.

$11.38$0.00$11.38
LABORER: COMMON OR GENERALSUTX2014-037

Base $11.80 + fringe $0.00 = you must pay at least $11.80/hr in wages + benefits.

$11.80$0.00$11.80
IRONWORKER, STRUCTURALSUTX2014-037

Base $22.16 + fringe $5.26 = you must pay at least $27.42/hr in wages + benefits.

$22.16$5.26$27.42
IRONWORKER, REINFORCINGSUTX2014-037

Base $12.27 + fringe $0.00 = you must pay at least $12.27/hr in wages + benefits.

$12.27$0.00$12.27
INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)SUTX2014-037

Base $19.77 + fringe $7.13 = you must pay at least $26.90/hr in wages + benefits.

$19.77$7.13$26.90
ELECTRICIANSUTX2014-037

Base $23.18 + fringe $6.31 = you must pay at least $29.49/hr in wages + benefits.

$23.18$6.31$29.49
CEMENT MASON/CONCRETE FINISHERSUTX2014-037

Base $13.76 + fringe $0.00 = you must pay at least $13.76/hr in wages + benefits.

$13.76$0.00$13.76
CARPENTERSUTX2014-037

Base $13.82 + fringe $0.00 = you must pay at least $13.82/hr in wages + benefits.

$13.82$0.00$13.82
BRICKLAYERSUTX2014-037

Base $20.00 + fringe $0.00 = you must pay at least $20.00/hr in wages + benefits.

$20.00$0.00$20.00

Am I compliant?

Pick the classification and enter what you pay per hour — base wage plus cash fringe or benefit contributions. The math happens right here on this page.

Informational only — this check compares your combined hourly base + fringe against the determination's combined rate. Verify with the contracting agency before relying on it.

Source: SAM.gov wage determination TX20260261, revision 1, published May 18, 2026. Rates are cached and refreshed daily. Always confirm the determination attached to your contract.