TX20260002
Armstrong, Carson, Crosby, Ector, Irion, Lubbock, Midland, Potter, Randall, Taylor & Tom Green Counties, Texas
Revision 1 · Published May 18, 2026 · 34 classifications · Heavy construction · Latest cached revision
Showing 34 of 34 classifications
| Classification | Base | Fringe | Total |
|---|---|---|---|
TRUCK DRIVER (TANDEM AXLE TRACTOR WITH SEMI)SUTX2011-002Base $12.49 + fringe $0.00 = you must pay at least $12.49/hr in wages + benefits. | $12.49 | $0.00 | $12.49 |
TRUCK DRIVER (SINGLE OR TANDEM AXLE DUMP)SUTX2011-002Base $11.33 + fringe $0.00 = you must pay at least $11.33/hr in wages + benefits. | $11.33 | $0.00 | $11.33 |
TRUCK DRIVER (SINGLE AXLE)SUTX2011-002Base $12.74 + fringe $0.00 = you must pay at least $12.74/hr in wages + benefits. | $12.74 | $0.00 | $12.74 |
TRUCK DRIVER (LOWBOY-FLOAT)SUTX2011-002Base $14.46 + fringe $0.00 = you must pay at least $14.46/hr in wages + benefits. | $14.46 | $0.00 | $14.46 |
STEEL WORKER (REINFORCING)SUTX2011-002Base $13.50 + fringe $0.00 = you must pay at least $13.50/hr in wages + benefits. | $13.50 | $0.00 | $13.50 |
SERVICERSUTX2011-002Base $13.98 + fringe $0.00 = you must pay at least $13.98/hr in wages + benefits. | $13.98 | $0.00 | $13.98 |
POWER EQUIPMENT OPERATOR: SCRAPERSUTX2011-002Base $10.61 + fringe $0.00 = you must pay at least $10.61/hr in wages + benefits. | $10.61 | $0.00 | $10.61 |
POWER EQUIPMENT OPERATOR: MECHANICSUTX2011-002Base $20.14 + fringe $0.00 = you must pay at least $20.14/hr in wages + benefits. | $20.14 | $0.00 | $20.14 |
POWER EQUIPMENT OPERATOR: (SPREADER BOX)SUTX2011-002Base $12.60 + fringe $0.00 = you must pay at least $12.60/hr in wages + benefits. | $12.60 | $0.00 | $12.60 |
POWER EQUIPMENT OPERATOR: (ROLLER, OTHER)SUTX2011-002Base $10.36 + fringe $0.00 = you must pay at least $10.36/hr in wages + benefits. | $10.36 | $0.00 | $10.36 |
POWER EQUIPMENT OPERATOR: (ROLLER, ASPHALT)SUTX2011-002Base $10.95 + fringe $0.00 = you must pay at least $10.95/hr in wages + benefits. | $10.95 | $0.00 | $10.95 |
POWER EQUIPMENT OPERATOR: (RECLAIMER/PULVERIZER)SUTX2011-002Base $12.85 + fringe $0.00 = you must pay at least $12.85/hr in wages + benefits. | $12.85 | $0.00 | $12.85 |
POWER EQUIPMENT OPERATOR: (PAVEMENT MARKING MACHINE)SUTX2011-002Base $16.42 + fringe $0.00 = you must pay at least $16.42/hr in wages + benefits. | $16.42 | $0.00 | $16.42 |
POWER EQUIPMENT OPERATOR: (MOTOR GRADER, FINE)SUTX2011-002Base $17.49 + fringe $0.00 = you must pay at least $17.49/hr in wages + benefits. | $17.49 | $0.00 | $17.49 |
POWER EQUIPMENT OPERATOR: (MOTOR GRADER, ROUGH)SUTX2011-002Base $16.15 + fringe $0.00 = you must pay at least $16.15/hr in wages + benefits. | $16.15 | $0.00 | $16.15 |
POWER EQUIPMENT OPERATOR: (MILLING MACHINE)SUTX2011-002Base $15.54 + fringe $0.00 = you must pay at least $15.54/hr in wages + benefits. | $15.54 | $0.00 | $15.54 |
POWER EQUIPMENT OPERATOR: (LOADER/BACKHOE)SUTX2011-002Base $14.18 + fringe $0.00 = you must pay at least $14.18/hr in wages + benefits. | $14.18 | $0.00 | $14.18 |
POWER EQUIPMENT OPERATOR: (FRONT END LOADER, 3CY OR LESS)SUTX2011-002Base $12.28 + fringe $0.00 = you must pay at least $12.28/hr in wages + benefits. | $12.28 | $0.00 | $12.28 |
POWER EQUIPMENT OPERATOR: (FRONT END LOADER OPERATOR, OVER 3 CY)SUTX2011-002Base $12.77 + fringe $0.00 = you must pay at least $12.77/hr in wages + benefits. | $12.77 | $0.00 | $12.77 |
POWER EQUIPMENT OPERATOR: (EXCAVATOR, 50,000 LBS OR LESS)SUTX2011-002Base $13.46 + fringe $0.00 = you must pay at least $13.46/hr in wages + benefits. | $13.46 | $0.00 | $13.46 |
POWER EQUIPMENT OPERATOR: (CRAWLER TRACTOR OPERATOR)SUTX2011-002Base $13.96 + fringe $0.00 = you must pay at least $13.96/hr in wages + benefits. | $13.96 | $0.00 | $13.96 |
POWER EQUIPMENT OPERATOR: (CRANE, LATTICE BOOM 80 TONS OR LESS)SUTX2011-002Base $16.82 + fringe $0.00 = you must pay at least $16.82/hr in wages + benefits. | $16.82 | $0.00 | $16.82 |
POWER EQUIPMENT OPERATOR: (BROOM AND SWEEPER)SUTX2011-002Base $11.21 + fringe $0.00 = you must pay at least $11.21/hr in wages + benefits. | $11.21 | $0.00 | $11.21 |
POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE)SUTX2011-002Base $13.40 + fringe $0.00 = you must pay at least $13.40/hr in wages + benefits. | $13.40 | $0.00 | $13.40 |
POWER EQUIPMENT OPERATOR: (ASPHALT DISTRIBUTER)SUTX2011-002Base $14.87 + fringe $0.00 = you must pay at least $14.87/hr in wages + benefits. | $14.87 | $0.00 | $14.87 |
LABORER: ASPHALT RAKERSUTX2011-002Base $12.28 + fringe $0.00 = you must pay at least $12.28/hr in wages + benefits. | $12.28 | $0.00 | $12.28 |
LABORER (WORK ZONE BARRICADE SERVICER)SUTX2011-002Base $10.30 + fringe $0.00 = you must pay at least $10.30/hr in wages + benefits. | $10.30 | $0.00 | $10.30 |
LABORER (LABORER, UTILITY)SUTX2011-002Base $11.80 + fringe $0.00 = you must pay at least $11.80/hr in wages + benefits. | $11.80 | $0.00 | $11.80 |
LABORER (LABORER, COMMON)SUTX2011-002Base $10.30 + fringe $0.00 = you must pay at least $10.30/hr in wages + benefits. | $10.30 | $0.00 | $10.30 |
LABORER (FLAGGER)SUTX2011-002Base $9.30 + fringe $0.00 = you must pay at least $9.30/hr in wages + benefits. | $9.30 | $0.00 | $9.30 |
FORM BUILDER/FORM SETTER (STRUCTURES)SUTX2011-002Base $13.52 + fringe $0.00 = you must pay at least $13.52/hr in wages + benefits. | $13.52 | $0.00 | $13.52 |
FORM BUILDER/FORM SETTER (PAVING & CURB)SUTX2011-002Base $12.36 + fringe $0.00 = you must pay at least $12.36/hr in wages + benefits. | $12.36 | $0.00 | $12.36 |
ELECTRICIANSUTX2011-002Base $20.96 + fringe $0.00 = you must pay at least $20.96/hr in wages + benefits. | $20.96 | $0.00 | $20.96 |
CEMENT MASON/CONCRETE FINISHER (PAVING & STRUCTURES)SUTX2011-002Base $13.55 + fringe $0.00 = you must pay at least $13.55/hr in wages + benefits. | $13.55 | $0.00 | $13.55 |
Am I compliant?
Pick the classification and enter what you pay per hour — base wage plus cash fringe or benefit contributions. The math happens right here on this page.
Informational only — this check compares your combined hourly base + fringe against the determination's combined rate. Verify with the contracting agency before relying on it.
Source: SAM.gov wage determination TX20260002, revision 1, published May 18, 2026. Rates are cached and refreshed daily. Always confirm the determination attached to your contract.