TX20260280
Crosby & Lubbock Counties, Texas
Revision 1 · Published May 18, 2026 · 37 classifications · Building construction · Latest cached revision
Showing 37 of 37 classifications
| Classification | Base | Fringe | Total |
|---|---|---|---|
BOILERMAKERBOIL0074-003Base $33.17 + fringe $24.92 = you must pay at least $58.09/hr in wages + benefits. | $33.17 | $24.92 | $58.09 |
CARPENTERCARP0665-001Base $28.57 + fringe $9.30 = you must pay at least $37.87/hr in wages + benefits. | $28.57 | $9.30 | $37.87 |
ELECTRICIANELEC0602-008Base $26.07 + fringe $12.63 = you must pay at least $38.70/hr in wages + benefits. | $26.07 | $12.63 | $38.70 |
POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER)ENGI0178-005Base $32.35 + fringe $13.10 = you must pay at least $45.45/hr in wages + benefits. | $32.35 | $13.10 | $45.45 |
POWER EQUIPMENT OPERATOR ((1) TOWER CRANE)ENGI0178-005Base $32.85 + fringe $13.10 = you must pay at least $45.95/hr in wages + benefits. | $32.85 | $13.10 | $45.95 |
IRONWORKER: ORNAMENTALIRON0084-011Base $28.26 + fringe $8.13 = you must pay at least $36.39/hr in wages + benefits. | $28.26 | $8.13 | $36.39 |
IRONWORKER, STRUCTURALIRON0263-003Base $29.64 + fringe $8.43 = you must pay at least $38.07/hr in wages + benefits. | $29.64 | $8.43 | $38.07 |
PLUMBERPLUM0404-001Base $28.64 + fringe $10.65 = you must pay at least $39.29/hr in wages + benefits. | $28.64 | $10.65 | $39.29 |
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)SHEE0049-001Base $26.72 + fringe $12.13 = you must pay at least $38.85/hr in wages + benefits. | $26.72 | $12.13 | $38.85 |
TRUCK DRIVER: WATER TRUCKSUTX2014-060Base $12.00 + fringe $4.11 = you must pay at least $16.11/hr in wages + benefits. | $12.00 | $4.11 | $16.11 |
TRUCK DRIVER: SEMI-TRAILER TRUCKSUTX2014-060Base $12.50 + fringe $0.00 = you must pay at least $12.50/hr in wages + benefits. | $12.50 | $0.00 | $12.50 |
TRUCK DRIVER: FLATBED TRUCKSUTX2014-060Base $19.65 + fringe $8.57 = you must pay at least $28.22/hr in wages + benefits. | $19.65 | $8.57 | $28.22 |
TRUCK DRIVER: DUMP TRUCKSUTX2014-060Base $12.39 + fringe $1.18 = you must pay at least $13.57/hr in wages + benefits. | $12.39 | $1.18 | $13.57 |
TILE SETTERSUTX2014-060Base $14.00 + fringe $2.01 = you must pay at least $16.01/hr in wages + benefits. | $14.00 | $2.01 | $16.01 |
TILE FINISHERSUTX2014-060Base $11.22 + fringe $0.00 = you must pay at least $11.22/hr in wages + benefits. | $11.22 | $0.00 | $11.22 |
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIONSUTX2014-060Base $21.13 + fringe $6.53 = you must pay at least $27.66/hr in wages + benefits. | $21.13 | $6.53 | $27.66 |
ROOFERSUTX2014-060Base $13.75 + fringe $0.00 = you must pay at least $13.75/hr in wages + benefits. | $13.75 | $0.00 | $13.75 |
PAINTER: BRUSH, ROLLER, AND SPRAYSUTX2014-060Base $14.27 + fringe $0.00 = you must pay at least $14.27/hr in wages + benefits. | $14.27 | $0.00 | $14.27 |
OPERATOR: ROLLERSUTX2014-060Base $12.70 + fringe $0.00 = you must pay at least $12.70/hr in wages + benefits. | $12.70 | $0.00 | $12.70 |
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)SUTX2014-060Base $16.03 + fringe $0.00 = you must pay at least $16.03/hr in wages + benefits. | $16.03 | $0.00 | $16.03 |
OPERATOR: MECHANICSUTX2014-060Base $17.52 + fringe $3.33 = you must pay at least $20.85/hr in wages + benefits. | $17.52 | $3.33 | $20.85 |
OPERATOR: LOADERSUTX2014-060Base $13.55 + fringe $0.94 = you must pay at least $14.49/hr in wages + benefits. | $13.55 | $0.94 | $14.49 |
OPERATOR: GRADER/BLADESUTX2014-060Base $13.37 + fringe $0.00 = you must pay at least $13.37/hr in wages + benefits. | $13.37 | $0.00 | $13.37 |
OPERATOR: FORKLIFTSUTX2014-060Base $14.83 + fringe $0.00 = you must pay at least $14.83/hr in wages + benefits. | $14.83 | $0.00 | $14.83 |
OPERATOR: DRILLSUTX2014-060Base $16.22 + fringe $0.34 = you must pay at least $16.56/hr in wages + benefits. | $16.22 | $0.34 | $16.56 |
OPERATOR: BULLDOZERSUTX2014-060Base $18.29 + fringe $1.31 = you must pay at least $19.60/hr in wages + benefits. | $18.29 | $1.31 | $19.60 |
OPERATOR: BOBCAT/SKID STEER/SKID LOADERSUTX2014-060Base $13.93 + fringe $0.00 = you must pay at least $13.93/hr in wages + benefits. | $13.93 | $0.00 | $13.93 |
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOESUTX2014-060Base $14.25 + fringe $0.00 = you must pay at least $14.25/hr in wages + benefits. | $14.25 | $0.00 | $14.25 |
LABORER: ROOF TEAROFFSUTX2014-060Base $11.28 + fringe $0.00 = you must pay at least $11.28/hr in wages + benefits. | $11.28 | $0.00 | $11.28 |
LABORER: PIPELAYERSUTX2014-060Base $12.49 + fringe $2.13 = you must pay at least $14.62/hr in wages + benefits. | $12.49 | $2.13 | $14.62 |
LABORER: MASON TENDER - CEMENT/CONCRETESUTX2014-060Base $10.58 + fringe $0.00 = you must pay at least $10.58/hr in wages + benefits. | $10.58 | $0.00 | $10.58 |
LABORER: MASON TENDER - BRICKSUTX2014-060Base $11.36 + fringe $0.00 = you must pay at least $11.36/hr in wages + benefits. | $11.36 | $0.00 | $11.36 |
LABORER: COMMON OR GENERALSUTX2014-060Base $12.35 + fringe $0.00 = you must pay at least $12.35/hr in wages + benefits. | $12.35 | $0.00 | $12.35 |
IRONWORKER, REINFORCINGSUTX2014-060Base $12.27 + fringe $0.00 = you must pay at least $12.27/hr in wages + benefits. | $12.27 | $0.00 | $12.27 |
INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)SUTX2014-060Base $19.77 + fringe $7.13 = you must pay at least $26.90/hr in wages + benefits. | $19.77 | $7.13 | $26.90 |
CEMENT MASON/CONCRETE FINISHERSUTX2014-060Base $19.60 + fringe $0.00 = you must pay at least $19.60/hr in wages + benefits. | $19.60 | $0.00 | $19.60 |
BRICKLAYERSUTX2014-060Base $20.04 + fringe $0.00 = you must pay at least $20.04/hr in wages + benefits. | $20.04 | $0.00 | $20.04 |
Am I compliant?
Pick the classification and enter what you pay per hour — base wage plus cash fringe or benefit contributions. The math happens right here on this page.
Informational only — this check compares your combined hourly base + fringe against the determination's combined rate. Verify with the contracting agency before relying on it.
Source: SAM.gov wage determination TX20260280, revision 1, published May 18, 2026. Rates are cached and refreshed daily. Always confirm the determination attached to your contract.